Laserfiche WebLink
r e ) Reinstall bathroom fixtures and closet lights . <br /> REMEDIAL FRAMING AND HARDWARE INSTALLATION <br /> a ) Remove section of the closet wall to create an opening for a <br /> countertop leaving a header the same height as the doorway and <br /> the base for partition wall at 36" high . AFF ( Exception : Room 181 <br /> does not receive this treatment . ) <br /> b ) Frame new 24- inch deep closet . ( Exception : Room 181 does not <br /> receive this treatment . ) <br /> c ) IN REGULAR ROOMS ONLY. ( Exception : Room 181 does not <br /> receive a countertop . ) Supply and install new countertop with <br /> bevel edge laminate . Install reinforcing panels and support <br /> beams beneath counter . Color to be selected . 2" computer <br /> grommet to pass through counter. <br /> d ) Supply and install flat slab 72" bi - pass door at new closet . <br /> Johnson Model # 138F Fascia track with heavy duty hardware . <br /> Hollow core hardboard primed 1-3/8" doors, doors to have four <br /> solid wood edges . ( Exception : Room 181 does not receive this <br /> treatment . ) <br /> e ) Supply and install 2- 1/2" round Ives satin nickel bi - pass pulls . <br /> ( Exception : Room 181 does not receive this treatment . ) <br /> f) Supply and install Deltana 3- 1/2" x 34/2" square steel U515 satin <br /> nickel door hinges and door strikes . <br /> g) Remove existing closet shelf and re- install . <br /> h ) Remove and replace bathroom door. Hollow core hardboard <br /> primed 1-3/8" doors, doors to have four solid wood edges . <br /> i ) Remove and replace any damaged base or casing . ( Match existing) <br /> j ) Remove and replace front window sill with standard marble and the <br /> bathroom window sill with standard marble . <br /> k) New full length mirror, 20" x 60" frameless with clips . <br /> SMALL ROOMS ONLY <br /> a ) Remove existing closet . <br /> b ) Frame new 24-inch deep closet . <br /> c) Supply and install flat slab 72" bi-pass door at new closet. Johnson <br /> Model # 138F Fascia track with heavy dutv hardware . Hollow core <br /> hardboard primed 1-3/8" doors, doors to have four solid wood <br /> edges . <br /> d ) Install VCT tile 12"X12" Armstrong Standard Excelon Imperial <br /> Texture (color to be selected by Verotown LLC) <br /> e ) Install Transition strips between carpet and tile . <br /> 01310-3 01310 Detailed Construction Scope of Work <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1341 -Historic Dodgertown (fka VB Sports Village) Room <br /> Renovations)Wdmin\bid documents\Master Contract Docs\Master Contract Documents\01310 - Detailed Construction Scope of Work <br /> REVISED 10=4-2013 .doc <br />