My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-211A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-211A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2015 2:00:04 PM
Creation date
10/1/2015 5:47:02 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/22/2013
Control Number
2013-211A
Agenda Item Number
8.M.
Entity Name
OAC Action Construction
Subject
Contract Documents and Specifications
Historic Dodgertown Room Renovations
Project Number
1341
Bid Number
2014003
Alternate Name
Vero Beach Sports Village
Supplemental fields
SmeadsoftID
12688
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REMEDIAL FRAMING AND HARDWARE INSTALLATION <br /> a ) Supply and install new countertop with bevel edge laminate . Height <br /> to be ADA compliant . Color to be selected . 2" computer grommet <br /> to pass through counter. Please note changes detailed on Plan <br /> Sheets 7 and 9 attached to Addendum No . 1 . <br /> b ) Supply and install Deltana 34/2" x 34/2" square steel US15 satin <br /> nickel door hinges and door strikes for bathroom doors . <br /> c ) Remove existing closet shelf and re- install later. <br /> d ) Remove and replace bathroom door. Hollow core hardboard <br /> primed 1-3/8" doors, doors to have four solid wood edges . <br /> e ) Remove and replace any damaged base or casing. ( Match Existing) <br /> f) Remove and replace front window sill with standard marble and the <br /> bathroom window sill with standard marble . <br /> g) New full length mirror, 20" x 60" frameless with clips . <br /> FLOORING <br /> a ) Supply and install bathroom flooring 18" x 18" rectified porcelain <br /> tile, minimum tile grout lines, grout and tile to be sealed . Dal -Tile <br /> Palatina PT 95 . Allow for an additional 36 sq . ft . in front of <br /> countertop to receive porcelain tile . Please note changes detailed <br /> on Plan Sheets 7 and 9 attached to Addendum No . 1 . <br /> b ) Supply and install 4" base board porcelain tile . <br /> c ) Room carpet to be removed and re- installed with new anti- microbial <br /> pads and nail strips . <br /> PAINTING & DRYWALL FINISH <br /> a ) Apply Gardz on all wall surfaces, skim walls to level 4 finish and <br /> apply medium knockdown texture . <br /> b ) Paint ceilings with 1 coat Zinsser 1- 2-3 primer, and 2 coats of <br /> Optima white acrylic flat finish . <br /> c ) Paint walls with 1 coat Zinsser 1- 2-3 primer, and 2 coats of Optima <br /> interior semi -gloss white finish . <br /> d ) Paint all doors with 1 coat Zinsser 1- 2- 3 primer, and 2 coats of <br /> Optima interior semi -gloss white finish . <br /> e ) Paint baseboards with 1 coat Zinsser 1- 2-3 primer, and 2 coats of <br /> Optima interior semi -gloss white finish . <br /> f) Prep all new doors and jambs, caulk all joints, fill all holes and sand <br /> all surfaces to receive primer or paint . <br /> g) All paint is to be Color Wheel . <br /> BATHROOM ACCESSORIES, HARDWARE, FURNITURE <br /> * * * * EXCEPTION SUITE #173 DOES NOT GET NEW FIXTURES. <br /> 01310- 10 01310 Detailed Construction Scope of Work <br /> FAIDublic Works\ENGINEERING DIVISION PROJECTS\1341 -Historic Dodgertown (fka VB Sports Village) Room <br /> Renovations)Wdmin\bid documents\Master Contract Docs\Master Contract Documents\01310 - Detailed Construction Scope of Work <br /> REVISED 10442013 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.