Laserfiche WebLink
REMEDIAL FRAMING AND HARDWARE INSTALLATION <br /> a ) Supply and install new countertop with bevel edge laminate . Height <br /> to be ADA compliant . Color to be selected . 2" computer grommet <br /> to pass through counter. Please note changes detailed on Plan <br /> Sheets 7 and 9 attached to Addendum No . 1 . <br /> b ) Supply and install Deltana 34/2" x 34/2" square steel US15 satin <br /> nickel door hinges and door strikes for bathroom doors . <br /> c ) Remove existing closet shelf and re- install later. <br /> d ) Remove and replace bathroom door. Hollow core hardboard <br /> primed 1-3/8" doors, doors to have four solid wood edges . <br /> e ) Remove and replace any damaged base or casing. ( Match Existing) <br /> f) Remove and replace front window sill with standard marble and the <br /> bathroom window sill with standard marble . <br /> g) New full length mirror, 20" x 60" frameless with clips . <br /> FLOORING <br /> a ) Supply and install bathroom flooring 18" x 18" rectified porcelain <br /> tile, minimum tile grout lines, grout and tile to be sealed . Dal -Tile <br /> Palatina PT 95 . Allow for an additional 36 sq . ft . in front of <br /> countertop to receive porcelain tile . Please note changes detailed <br /> on Plan Sheets 7 and 9 attached to Addendum No . 1 . <br /> b ) Supply and install 4" base board porcelain tile . <br /> c ) Room carpet to be removed and re- installed with new anti- microbial <br /> pads and nail strips . <br /> PAINTING & DRYWALL FINISH <br /> a ) Apply Gardz on all wall surfaces, skim walls to level 4 finish and <br /> apply medium knockdown texture . <br /> b ) Paint ceilings with 1 coat Zinsser 1- 2-3 primer, and 2 coats of <br /> Optima white acrylic flat finish . <br /> c ) Paint walls with 1 coat Zinsser 1- 2-3 primer, and 2 coats of Optima <br /> interior semi -gloss white finish . <br /> d ) Paint all doors with 1 coat Zinsser 1- 2- 3 primer, and 2 coats of <br /> Optima interior semi -gloss white finish . <br /> e ) Paint baseboards with 1 coat Zinsser 1- 2-3 primer, and 2 coats of <br /> Optima interior semi -gloss white finish . <br /> f) Prep all new doors and jambs, caulk all joints, fill all holes and sand <br /> all surfaces to receive primer or paint . <br /> g) All paint is to be Color Wheel . <br /> BATHROOM ACCESSORIES, HARDWARE, FURNITURE <br /> * * * * EXCEPTION SUITE #173 DOES NOT GET NEW FIXTURES. <br /> 01310- 10 01310 Detailed Construction Scope of Work <br /> FAIDublic Works\ENGINEERING DIVISION PROJECTS\1341 -Historic Dodgertown (fka VB Sports Village) Room <br /> Renovations)Wdmin\bid documents\Master Contract Docs\Master Contract Documents\01310 - Detailed Construction Scope of Work <br /> REVISED 10442013 .doc <br />