My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-197
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-197
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2016 2:16:55 PM
Creation date
10/1/2015 4:44:20 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/23/2012
Control Number
2012-197
Agenda Item Number
15.B.4
Entity Name
Paul Jacquin and Sons
Subject
New Oslo Customer Convenience Center Agreement
Area
Oslo Customer Convenience Center
Supplemental fields
SmeadsoftID
11522
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b . Architectural <br /> c . HVAC <br /> d . Miscellaneous Work <br /> 7 . Elevated Ramp <br /> a. Structural Concrete Slabs and Footers <br /> b . Expanded Polystyrene Geofoam and Structural Fill <br /> c. Shotcrete <br /> Ids Retaining Wall <br /> e. Miscellaneous Work <br /> 8 . i Painting and Coatings <br /> i . <br /> 9 . Electrical <br /> 10 . Horizontal Ram Stationary Compactor <br /> 11 . , Emergency Generator <br /> i <br /> 12 . Miscellaneous <br /> 13 . ( Restroom and Office Amenities Allowance <br /> i <br /> 14 . Tools, Storage, and Facility Sign Allowance <br /> 15 . ( Contingency <br /> i <br /> 16 . Demolition of Existing Facilities <br /> ARTICLE 2 ENGIN ER <br /> 2. 1 The project has been designed by CDM Smith Inc., hereinafter called ENGINEER, and who is to <br /> act as OWNER'S reprejentative, assume all duties and responsibilities and have the rights and authority <br /> assigned to ENGINEEI in the Contract Documents in connection with completion of the work in <br /> accordance with the Cor Tact Documents, <br /> I <br /> ARTICLE 3 CONTRACT TIME <br /> 3 . 1, CONTRACTOR shall achieve Partial Utilization with the work within one hundred twenty <br /> ( 120) calendar days from the date of Notice to Proceed. The CONTRACTOR shall be substantially <br /> completed with the wor one hundred fifty ( 150) calendar days after issuance of the Notice to Proceed, in <br /> accordance with Paragfaph 2 .03 of the General Conditions, and be completed and ready for final <br /> payment in accordance with Paragraph 14. 07 of the General Conditions within one hundred eighty ( 180) <br /> calendar days after the i$suance of the Notice to Proceed. <br /> 3 .2 Liquidated Dam aes. OWNER and CONTRACTOR recognize that time is of the essence of this <br /> some <br /> Agreement and that OWNER will suffer financial loss if the work is not completed' within the times <br /> specified in Paragraph 3 . 1 above, plus any extensions thereof allowed in accordance with Article 12 of the <br /> General Conditions . They also recognize the delays, expense and difficulties involved in proving in a legal <br /> 00530-2 VRB <br />
The URL can be used to link to this page
Your browser does not support the video tag.