Laserfiche WebLink
l��iaaoi3 <br />g <br />aD l3 -� <br />PRECISILJN CC7NTRACTIIN SERVICES INC. <br />-----__--- <br />Precision Fiber ! Optic Systems <br />_ _ _ _ - _. �l1�1 <br />15834 Guild Court <br />Jupiter, Florida 33478 <br />Phone: 561.743.9737 <br />Fax: 561.743.0775 <br />rr�.pcsfiber.com <br />To: <br />Address: <br />PCS Vero <br />9035 17th Place <br />Vero Beach, FL 32966 USA <br />$135.00 <br />Contact: <br />Phone: <br />Fax: <br />Donald Hawkins <br />(772) 633-4969 <br />(772) 770-3343 <br />Project Name: <br />Project Location: <br />13.09.23 IRC SONET Redesign - Minor Site <br />Indian River County, Vero Beach, FL <br />Modifications <br />Bid Number: <br />Bid Date: <br />9/23/2013 <br />MILE <br />$1,000.00 <br />1.50 <br />MILE <br />Item # Item <br />Description <br />Estimated Quantity Unit <br />Unit Price Total Price <br />System Design -Engineering -Technical Service <br />530-4-101 BICSI Reg Comm Dist Design Services <br />530-5-102 CADD Operator <br />633-1-10 OSP ROW Strand Mapping <br />633-1-20 OSP ROW Design & Permitting <br />633-1-30 OSP FO Electronics Asbuilts <br />633-1-40 OSP GPS Surveying <br />6.00 <br />HR <br />$135.00 <br />10.00 <br />HR <br />$85.00 <br />1.50 <br />MILE <br />$500.00 <br />1.50 <br />MILE <br />$1,000.00 <br />1.50 <br />MILE <br />$250.00 <br />1.50 <br />MILE <br />$500.00 <br />$810.00 <br />$850.00 <br />$750.00 <br />$1,500.00 <br />$375.00 <br />$750.00 <br />Total Price for above System Design -Engineering -Technical Service Items: $5,035.00 <br />Hobart Tower Facility <br />530-7-104b Comm Cable -Electronics Technician (Onsite) <br />633-9-A FO Jumper, Duplex ST -LC, SM, 10'(F Only) <br />20th Ave & 12th St <br />633 -9 -RE FO Closure Reentry Kit, Cable Prep (F & I) <br />633 -ST -12 Splice Tray, Fusion Heatshrink, 12F, 12" (F & I) <br />633-9-A Fusion Splice Heat Shrink <.ldb OSP (F&I) <br />County Administration <br />530-7-104b Comm Cable -Electronics Technician (Onsite) <br />633-9-A FO Jumper, Duplex ST -LC, SM, 10' (F Only) <br />Dogertown Facility <br />633 -9 -RE FO Closure Reentry Kit, Cable Prep (F & I) <br />633-ST42 Splice Tray, Fusion Heatshrink, 12F, 12" (F & I) <br />633-9-A Fusion Splice Heat Shrink <.ldb OSP (F&I) <br />Water Plant <br />530-7-104b <br />633-9-A <br />FEC Location <br />530-7-104b <br />633 -9 -RE <br />633 -ST -12 <br />633-9-A <br />Comm Cable -Electronics Technician (Onsite) <br />FO Jumper, Duplex ST -LC, SM, 10' (F Only) <br />1.00 HR $100.00 <br />2.00 EACH $49.95 <br />Total Price for above Hobart Tower Facility Items: <br />$100.00 <br />$99.90 <br />$199.90 <br />1.00 <br />EACH <br />$375.00 <br />$375.00 <br />1.00 <br />EACH <br />$45.00 <br />$45.00 <br />12.00 <br />EACH <br />$35.00 <br />$420.00 <br />Total Price for above 20th Ave & 12th St Items: $840.00 <br />2.00 <br />HR <br />$100.00 <br />$200.00 <br />4.00 <br />EACH <br />$49.95 <br />$199.80 <br />Total Price for above County Administration Items: $399.80 <br />1.00 <br />EACH <br />$375.00 <br />$375.00 <br />1.00 <br />EACH <br />$45.00 <br />$45.00 <br />12.00 <br />EACH <br />$35.00 <br />$420.00 <br />Total Price for above Dogertown Facility Items: $840.00 <br />2.00 <br />HR <br />$100.00 <br />$200.00 <br />2.00 <br />EACH <br />$49.95 <br />$99.90 <br />Total Price for <br />above Water <br />Plant Items: <br />$299.90 <br />Comm Cable -Electronics Technician (Onsite) 2.00 HR $100.00 $200.00 <br />FO Closure Reentry Kit, Cable Prep (F & I) 1.00 EACH $375.00 $375.00 <br />Splice Tray, Fusion Heatshrink, 12F, 12 (F & I) 1.00 EACH $45.00 $45.00 <br />Fusion Splice Heat Shrink <.ldb OSP (F&I) 2.00 EACH $35.00 $70.00 <br />11/5/2013 8:20:03 AM <br />Page 1 of 4 <br />