Item # Item Description Estimated Quantity Unit Unit Price Total Price <br />530-9-106b Communication Duct Installer (Onsite) 4.00 HR $75.00 $300.00 <br />630-543-36 Conduit, 2" PVC @ 36", Hand Trench (F&I) 40.00 LF $6.25 $250.00 <br />630 -642 -db Directional Bore, 2" HDPE (F&I) 525.00 LF $11.95 $6,273.75 <br />630 -7 -MT Detectable Marking Tape (F&I) 11050.00 LF $0.75 $787.50 <br />630 -7 -JL Jet Line (F&I) 11050.00 LF $0.15 $157.50 <br />630 -7 -ROW ROW Delineator Marker Post Orange 6" (F&I) 5.00 EACH $85.00 $425.00 <br />635-8421TR Pullboxes 17"x30"x12" W/ Lid Traffic Rated (F&I) 2.00 EACH $595.00 $1,190.00 <br />6334413-96 FO Cable 96F SM LT UG (F&I) 1450 LF On IRC 0.00 LF $1.95 $0.00 <br />Courthouse To Southern Bell Proposal Required For <br />SONET Connection <br />633-8-96A4 FO Term, Housing 96F Wall/Rack (F&I) 1.00 EACH $61395.00 $61395.00 <br />633-8-96A FO Splice Closure 96F Aerial/UG (F&I) 1.00 EACH $3,975.00 $3,975.00 <br />633-8-B OTDR Test Any Wavelength Bare Fiber FOSC (Install 192.00 EACH $8.00 $1,536.00 <br />Only) <br />Total Price for above 16th Ave To Alley Behind So. Bell Items: $22,229.75 <br />Total Bid Price: $67,084.65 <br />Notes: <br />• Location: Indian River County, FL <br />Fiber Optic modifications At 14Separate Sites To Facilitate The SONET Redesign. <br />• PCS quotes the UG -Aerial installation, splicing, termination, testing, and re-routing of a fiber circuit though the locations listed to replace existing <br />IRC SONET equipment. <br />• PCS Proposal is not mutually exclusive. Contract to include ALL PCS proposed items @ proposed unit prices. <br />• PCS will Mobilize a total of (1) one time for the proposed work after noticed by the contractor. Additional Mobilizations will be billed as additions to <br />contract at $500 per Mobilization. <br />• PCS has NOT included any provisions for a performance bond. <br />• Sales or use tax has been included for all materials. <br />• PCS will require (10) ten work days to perform the proposed work. <br />• Proposed pricing is based on award of all items bid upon. PCS reserves the to modify unit prices if all quoted items are not awarded. <br />' PCS will provide MOT for the immediate work area of their crews as required by the MUTCD. however any MOT requiring lane closures, detours, <br />traffic diversions or police officers necessary for the safe performance of work by PCS is to be handled by Others. <br />• PCS requires 30 days written notice for project scheduling. <br />• All conduits, cable tray, pull boxes, manholes, ladder racks, man hole racks, risers, entrances and/or poles must be installed and tied in by OTHERS <br />prior to PCS starting work. PCS only includes installation or furnish and installation of fiber optic components and specifically EXCLUDES all <br />infrastructure hardware unless specifically included in specific pay items expressly for the specific infrastructure. PCS is not responsible for damage <br />by others to FO Cable or other equipment after placement by PCS. Contractor must allow sufficient time for Subcontractor to complete its scope of <br />work after access to raceways is given. <br />' Proposed pricing is based on award of all items bid upon. PCS reserves the right to modify unit prices if all quoted items are not awarded. Prices <br />are only valid for 90 days of the bid date. PCS reserves the right to modify or withdraw their offer if either a letter of intent or a contract is not <br />received within 90 days of the bid date. <br />' This proposal in its entirety and including all notes of clarification shall be added as an addendum to any resulting contract for the referenced <br />project. If any of the PCS notes of clarification conflict with the contract provisions, the PCS notes shall supercede the contract provisons and <br />govern accordingly. <br />• PCS is not responsible for damage by others to FO Cable or other equipment after placement by PCS. <br />• PCS is a certified MWBE Contractor with specific agencies. It is the bidders responsibility to verify PCS's current status prior to utilizing this proposal <br />to meet required contract goals. <br />• Warranty: Transition Network electronic equipment is not part of this proposal and is assumed to be purchased by the customer, and will be <br />under warranty for the first year per the warranty agreement directly with Transition Networks - Not PCS. <br />• Maintenance: First year maintenance will be time and material from the IRC Master Contract with PCS. Second year maintenance will be <br />negotiated under a seperate proposal. <br />• At the South Tower Location: PCS quotes the termination of (3) three 96F SM cables. This proposal does not include splice housings, <br />Connector housings, or coupler panels and assumes that they are existing as per the customer. <br />• At the South Tower Location: When the installation of fiber optic cable is included within PCS's scope of work, All conduit, cable tray, pull <br />boxes, risers, entrances and/or poles must be installed and tied in by OTHERS prior to PCS begining work. <br />• At the 16th Ave. to Alley Way behind Southern Bell: This does not include the fiber optic cable. THe fiber optic cable for this location is on a <br />seperate proposal. <br />Payment Terms: <br />Payment terms: NET 30 Days and 18% APR for balances exceeding 30 Days. <br />11/5/2013 8:20:03 AM Page 3 of 4 <br />