My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 1:49:43 PM
Creation date
10/1/2015 4:59:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/18/2012
Control Number
2012-227A
Agenda Item Number
8.Q.
Entity Name
Proctor Construction Company
Subject
Crime Scene Facility
Renovation of Warehouse
Area
3885 4th Street
Bid Number
201311
Supplemental fields
SmeadsoftID
11694
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit " C " - List of Drawings and Specifications <br /> Current Drawing List <br /> Summary Log , Grouped by Type and Discipline <br /> Indian River Crime Scene Investigation Facility Project # IRC=CSI0112013 Proctor Construction Co. <br /> 3885 41st Street Tel : 772.234.8164 Fax: 772.234.8188 <br /> Vero Beach, Florida 32960 <br /> Number Rev Title Rev D . Category <br /> 3tgrChlteetlaral <br /> ARCHITECTUAL <br /> A0. 10 11 /2/12 Cover Sheet 11 /2/2012 0 Bid Set <br /> A0.20 11 /2/12 Drawing Index 11 /2/2012 0 Bid Set <br /> A1 . 10 11 /2/12 Life Safety Plan and Code 11 /2/2012 0 Bid Set <br /> Review <br /> A2. 10 11 /2/12 Existing / Demolition Plan 11 /2/2012 0 Bid Set <br /> A2. 11 11/2/12 Proposed Floor Plan 11 /2/2012 0 Bid Set <br /> A2. 12 1112/12 Dimension Plan 11 /2/2012 0 Bid Set <br /> A2.20 11 /2/12 Existing / Demolition Roof Plan 11 /2/2012 0 Bid Set <br /> A2.21 11 /2112 Proposed Roof Plan and Roof 11 /2/2012 0 Bid Set <br /> Drainage Calculations <br /> A2 .30 11 /2/12 Enlarged Plans 11 /2/2012 0 Bid Set <br /> A2.40 11 /2/12 Proposed Reflected Ceiling 11 /2/2012 0 Bid Set <br /> Plan <br /> A3. 10 11/2/12 E)asting / Demolition Exterior 11 /2/2012 0 Bid Set <br /> Elevations <br /> A3. 11 11 /2/12 Proposed Exterior Elevations 11 /2/2012 0 Bid Set <br /> A4. 10 11 /2112 Building Sections 11 /2/2012 0 Bid Set <br /> A4. 11 11 /2/12 Building Sections 11 /2/2012 0 Bid Set <br /> A4. 12 11 /2/12 Building Sections 11 /2/2012 0 Bid Set <br /> A4.20 11/2/12 Wall Sections 11/2/2012 0 Bid Set <br /> A4.21 11 /2/12 Wall Sections 11 /2/2012 0 Bid Set <br /> A4.22 11 /2/12 Wall Sections 11 /2/2012 0 Bid Set <br /> A5. 10 11/2/12 Toilet Fixtures & Accessory 11 /2/2012 0 Bid Set <br /> Prolog Manager Printed on: 12/20/2012 Prolog Main Office Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.