CONTRACTOR Costs
<br /> 3 2.4. 1 , 3 .2 .42 3 .7. 3, 3 . 8.2, 3 . 15 .2, 5 .4.2; 6. 1 . 1 , 6.2 . 35
<br /> Contractor, Definition of 7. 3 .3 . 3 , 7 .3 . 7, 7 .3 . 8, 7. 3 . 9, 9. 10.2, 10. 3 .2, 10. 3 . 6,
<br /> 3. 1, 6. 1.2 11 . 3 , 12 . 1 .2, 12 .2. 1 , 12 .2.4, 13 . 5, 14
<br /> Contractor's Construction Schedules Cutting and Patching
<br /> VIF 3. 10, 3 . 12 . 1 , 3 . 12.2; 6. 1 . 3 , 15 . 1 . 5 .2 3. 14, 6.2. 5
<br /> Contractor' s Employees Damage to Construction of Owner or Separate
<br /> aa
<br /> 3 . 3 . 2, 3 .4 . 3 , 3 . 8 . 1 , 3 .9, 3 . 18.2, 4.2 . 31 4 .2. 6, 10 .29 10. 3 , Contractors
<br /> I ;Err 11 ,1 . 1 , 11 . 3 .7, 14. 1 , 14.2. 1 . 1 , 3 . 14.2, 6.2.4, 10.2. 1 .2, 10.2 . 5910.4911 . 1 . 1 , 11 .3,
<br /> Ir r
<br /> Contractor' s Liability Insurance 12 . 2.4
<br /> 1 Ll Damage to the Work
<br /> Contractor's Relationship with Separate Contractors 3 . 14.2, 9.9. 11 10.2. 1 .2, 10.2 . 5 , 10.4. 1 , 11 .3 . 19 12.2 .4
<br /> Uir
<br /> tr . Zr
<br /> VE rrand Owner's Forces Damages, Claims for
<br /> 3 . 12. 5 , 3 . 14.2, 4. 2.4, 6, 11 . 3 .7, 12 . 1 .23 12 .2.4 3 .2.4, 3 18 6. 1 . 1 , 8. 3 .3 , 9. 5 . 1 , 9.6. 7,
<br />10 .3. 3 , 11 . 1 . 1rr ,
<br /> :i Contractor's Relationship with Subcontractors 11 . 3 . 5 , 11 . 3 . 75 14. 1 . 3 , 14.2.4, 15 , 1 . 6
<br /> 1 .2.2, 131 %. 3 . 18 . 1 , 3 . 18 .2 ; 5, 9. 6.2 , 9. 6 .7, 9. 10.2, Damages for Delay
<br /> 11. 3 . 1 ,2, 11 . 3.7, 113 . 8 6. 1 . 1 , 8.3 .3 , 9 .5 . 1 . 6, 9. 7, 10 . 3 .2
<br /> IIrir Contractor's Relationship rjEt,with the Architect Date of Commencement of the Work, Definition of
<br /> It
<br /> i . 1 .2, 1 5, 3 . 1 :3 , 3 .2 .2, 3 .2 . 3, 31.
<br /> 2.49 3 . 3 . 19 3 .4. 2, 3 . 5, 8. 1.2
<br /> 3 . 7.4, 3 . 10, 1 1 , 3 . 12, 3 . 16,3 . 18, 4. 1 . 3 , 4.2, 5 .2, Date of Substantial Completion, Definition of
<br /> 6 .2.2, .7, 8. 31 ; 9.2, 9. 3, 9.4,°9. 5, 9 .7, 9 . 8, 9 .9, 10.2 .69 8. 1.3
<br /> 10rrr . 3, 11 . 3 . 7, 12, 13 . 5; 15. 1 .2; 15.2. 1 Day, Definition of
<br /> Contractor's Representations ` 8. 1.4
<br /> Ir
<br /> 3 .2. 1 , 3`.2 .2, 3,IM Ir
<br /> ;5 , 3 . 12:6, 6.2.2, 8:2 . 19 9 . 3 . 3, 9 . 8. 2 Decisions of the Architect
<br /> Contractor' s Responsibility for Those Performing the 3 . 7.4, 4. 2 .6, 4 .2 .7, 4.2. 11 , 4 .2. 12, 4 .2 . 13 , 15 .2, 6. 3 ,
<br /> E . Work : Errr . 7 .3 . 7, 7. 3 .9, 8 . 1 . 3 , 8 .3 . 15 9 . 29 9.4, 9. 5 . 1 , 9. 8.4, 9. 9.1 ,
<br /> 3 . 3 .2, 3 . 18, 5. 3 . 1 , 6. 1 :3 , 6,20 9. 5 . 1 , 10.2 . 8 13 . 5 .22 14.2.2, 14.2.4, 15 . 1 , 15 .2
<br /> 1. r iir III Contractor' s Review of Contract Documents Decisions to Withhold Certification
<br /> 3 ,2EVr: 9.4. 1 , 9.5, 9. 79 14. 1 . 1 .3
<br /> Contractor's Right to Stop the Work Defective or Nonconforming Work, Acceptance,
<br /> 9, 7 Rejection and Correction of
<br /> Contrar.rctor' s Right to Terminate the Contract 2 . 3 . 1 , 2.4 . 1 , 3 . 5 , 4.2 . 6, 6 .2 . 59 9. 5 . 1 , 9 . 5 .2, 9. 6.6, 9. 8.2,
<br /> 14 . 1 15 . 1 .6it r
<br /> 9 .9. 3 , 9. 10.4, 12.2. 1
<br /> Ur r
<br /> Contractor' s Submittals Definitions
<br /> 3 . 10, 3 , 11 , 3 . 12 .4, 4 . 2.7, 5 .2. 1 , 5 .2. 3 , 9:2, 9. 3 , 9. 8.2, 1 . 112. 1 . 1 , 3 . 1 . 1 , 3 . 5 , 3 . 12. 1
<br />, 3 . 12.2, 3 . 12. 394. 1 . 15
<br /> 9. 8.31 9.9 . 1 , 9. 10.2, 9 . 10.3 , 11 . 1 .39 11 .4 .2 15 . 1 . 11 5 . 1 , 6. 1 .25 7.2 . 11 7. 3 . 1 , 8 . 19 9. 1 ,
<br /> 9. 8. 1
<br /> Contractor' s Superintendent Delays and Extensions of Time
<br /> 3 .9, 10.2: Ir .6 3 .2, 3 . 7.4, 5 .2 .3 , 7.2 . 1 , 7.3 . 1 , 7.4, 8.3, 9 . 5 . 1 , 9. 7,
<br /> Contractor' s Supervision and ConstIt —ruction 10. 3 .29 10.4. 1 , 14. 3 .2, 15. 1 . 5 , 15.2. 5
<br /> Procedures Disputes
<br /> 1 ,2.2, , 3 . 3 , 366
<br /> .4, 3 . 12. 10, 4.2.2; 4.2.7, 6. 1 .3 , 6. 2 .4, 639 739 % 15 . 1 , 15 .2
<br /> 6 66
<br /> 7. 1 . 3 , 7. 3 . 5, 7:3 . 7, R2, 10, 12, 14, 15 . 1 . 3 Documents and Samples at the Site
<br /> Ir Contractual Liability Insurance 3. 11
<br /> I Ar
<br /> t IV
<br /> 11 . 1 . 1 .8 , 11 .2 Drawings, Definition of
<br /> Coordmation 'and Correlation 1 . 1.5
<br /> L2 3 .2. 1 ,' 3. 3' 66r r
<br /> .. 1rt
<br /> 11r, 3 . 16.66 Lr ©, 3 , 12.6, 6. 1 . 3 , 6.2 . 1 Drawings and Specifications, Use and Ownership of
<br /> It, I1.6 Vir Copies Furnished of Drawings and Specifications 3 . 11
<br /> 1 . 51, 2. 2. 51, 3 . 11 Effective Date of Insurance
<br /> Copyrights 8 . 2.2, 11 . 1 .2
<br /> 1596,30 17. Emergencies
<br /> Correction of Work 10.4, 14. 1 . 1 .2, 15 . 1 .4
<br /> 2 . 3, 2 4, 3 . . 3 9.4.2, 9. 8 .2 , 9. 8.3, 9.9. 1 , 12 . 1 .2, 12.2 Employees, Contractor ' s
<br /> An
<br /> Correlation and ' Intent of the Contract Documents 3 .3 . 2, 3 .4 .39 3 .8 . 1 , 3 .9, 3 . 18 .2, 4 .2 . 3 , 4.2. 6, 10.2,
<br /> 1 .2 10. 3 . 3911 . 1 . 1911 . 3 .7, 14. 1 , 14 .2. 1 . 1
<br /> Cost, Definition of
<br /> 7.3.7
<br /> (nit. AIA Document A201 TM — 2007. Copyright ® 1911 , 1915, 1918, 1925, 1937, 1951 , 1958, 1961 , 1963, 1966, 1970, 1976, 1987, 1997 and 2007
<br /> by The American
<br /> Institute of Architects. All rights reserved. WARNING : This AIA® Document is protected by U.S. Copyright Law and International Treaties. unauthorized
<br /> reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted
<br /> to the
<br /> maximum extent possible underthe law. This document was produced by AIA software at 11 :28: 34 on 12/21 /2012 under Order No.4386727979_1 which
<br /> expires on 02/05/2013, and is not for resale.
<br /> User Notes: (811102566)
<br />
|