§ 1 .2.2 Organization of the Specifications into divisions, sections and articles, and arrangement of Drawings shall not
<br /> control the Contractor in dividing the Work among Subcontractors or in establishing the extent of Work to be
<br /> perfolimed by any trade.
<br /> It
<br /> § 13.3 Unless otherwise stated in the Contract Documents, words that have well-known technical or construction
<br /> . industry,meanings are used in the Contract Documents in accordance with such recognized meanings.
<br /> I I 'LL
<br /> § 1 .3 CAPITALIZATION
<br /> Terms capitalized in these General Conditions include those that are ( 1 ) specifically defined, (2) the titles of
<br /> numbered articles or (3) the titles of other documents published by the American Institute of Architects.
<br /> § 1 .4 INTERPRETATIONffln
<br /> In the interest of brevity the Contract Documents frequently omit modifying words such as "all" and "any" and
<br /> articles such as "the" and "an;" but the fact that a modifier or an article is absent from one statement and appears in
<br /> another s not intended to affect the interpretation of either statement.
<br /> §1 .5 OWNERSHIP AND USE O.F DRAWINGS, SPECIFICATIONS AND OTHER INSTRUMENTS OF SERVICE
<br /> § 1 .5.1 .ILL
<br /> The Architect.. and the Architect' s consultants shall be deemed the authors and owners of their respective
<br /> it
<br /> Instruments of Service, including the Drawings and Specifications, and will retain all common law, statutory and
<br /> other reserrights, including copyrights. The Contractor, Subcontractors, Sub-subcontractors; and material or
<br /> ved
<br /> equipment suppliers shall not own or claim a copyright in the Instruments of Service. Submittal or distribution to
<br /> meet official regulatory requirements or for other purposes in connection with this Project is not to be construed as
<br /> ii; 4,Lpublication in 'derogaton of the Architect' s or Architect' s consultants' reserved rights.
<br /> Litt , In
<br /> LL- § 1 .5.2 The Contractor, Subcontractors, Sub-subcontractors and material or equipment suppliers are authorized to use
<br /> and reproduce' the Instruments of Service provided to them solely and exclusively for execution of the Work. All
<br /> copies made under thi authorization shall bear the copyright notice, if any, shown on the Instruments of Service.
<br /> The Contractor, Subcontractors, Sub-subcontractors, and material or equipment suppliers may not use the
<br /> Instruments of Service on other projects or for additions to this Project outside the scope of the Work without the
<br /> I I 'LL
<br /> specific written consent of the Owner, Architect and the Architect' s consultants.
<br /> I LL
<br /> § 1 .0 TRANSMISSION OF DATA IN DIGITAL FORM
<br /> If the parties intend to transmit Instruments of Service or any other information or documentation in digital form,
<br /> they shall endeavor to establish necessary protocols governing such transmissions, unless otherwise already
<br /> provided in the Agreement or the Contract Documents.
<br /> I ' LL LL I
<br /> INE I
<br /> ARTICLE 2tOWNERAL
<br /> It LI
<br /> LL
<br /> LL § 2. 1 GENERAL
<br /> § 2.1 .1 The ON is the person or entity identified as such in the Agreement and is referred to throughout the
<br /> Contract Documents as if singular in number. The Owner shall designate in writing a representative who shall have
<br /> express authority to bind the Owner with respect to all matters requiring the Owner' s approval or authorization.
<br /> Except as otherwise provided m Section 4 .2 . 1 , the Architect does not have such authority. The term "Owner" means
<br /> I LLILL
<br /> the Owner or the Owner' s authorized representative.
<br /> LL I LL
<br /> LL
<br /> § 2.1 .2 TheLL
<br /> Owner shall furnish to the Contractor within fifteen days after receipt of a written request, information
<br /> necessary and relevant for the Contractor to evaluate, give notice of or enforce mechanic' s lien rights. Such
<br /> III * shall mclude a correct statement of the record legal title to the property on which the Project is located,
<br /> ...
<br /> usually referred to as the site, and the Owner ' s interest therein.
<br /> tit
<br /> § 2.2 INFORMATION AND SERVICES REQUIRED OF THE OWNER
<br /> § JLLL
<br /> LL L
<br /> 2.2. 1 Prior to commencement of the Work, the Contractor may request in writing that the Owner provide
<br /> reasonable evidence that the Owner has made financial arrangements to fulfill the Owner' s obligations under the
<br /> Contract, Thereafter, the Contractor may only request such evidence if ( 1 ) the Owner fails to make payments to the
<br /> I I 'LL 11 1 _.m .
<br /> Contractor as the Contract Documents require; (2) a change in the Work materially changes the Contract Sum ; or (3 )
<br /> the Contractor identifies in writing a reasonable concern regarding the Owner' s ability to make payment when due.
<br /> The Owner shall furnish such evidence as a condition precedent to commencement or continuation of the Work or
<br /> Init AIA Document A201 TM — 2007. Copyright ® 1911 , 1915, 1918, 1925, 1937, 1951 , 1958, 1961 , 1963, 1966, 1970$ 1976, 1987t 1997 and
<br /> 2007 by The American
<br /> Institute of Architects. All rights reserved. WARNING : This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized
<br /> 1
<br /> reproduction or distribution of this AIA® Document, or any portion of It, may result In severe civil and criminal penalties, and will be prosecuted
<br /> to the
<br /> maximum extent possible under the law. This document was produced by AIA software at 11 :28: 34 on 12/21 /2012 under Order No.4386727979 1 which
<br /> expires on 02/05/2013, and is not for resale.
<br /> User Notes: (811102566)
<br />
|