Laserfiche WebLink
required to provide professional services in violation of applicable law. If professional design services or <br /> certifications by a design professional related to systems, materials or equipment are specifically required of the <br /> Contractor by the Contract Documents, the Owner and the Architect will specify all performance and design criteria <br /> that such services must satisfy. The Contractor shall cause such services or certifications to be provided by a <br /> properly licensed design professional, whose signature and seal shall appear on all drawings, calculations, <br /> specifications, certifications, Shop Drawings and other submittals prepared by such professional. Shop Drawings <br /> and other submittals related to the Work designed or certified by such professional, if prepared by others, shall bear <br /> Nil <br /> such professional ' s written approval when submitted to the Architect. The Owner and the Architect shall be entitled <br /> to rely upon the adequacy, accuracy and completeness of the services, certifications and approvals performed or <br /> 1 , 116 provided by such design professionals, provided the Owner and Architect have specified to the Contractor all <br /> performance1­ 6 and design criteria that such services must satisfy. Pursuant to this Section 3 . 12 . 10, the Architect will <br /> review, approve or take other appropriate action on submittals only for the limited purpose of checking for <br /> conformance with information given and the design concept expressed in the Contract Documents. The Contractor <br /> IF <br /> " I FF Ishall not be responsible for the adequacy of the performance and design criteria specified in the Contract <br /> IF; 6DOGUlnent& <br /> 1111.6- 6 1 <br /> 16 <br /> § 3.13 USE OF SITE <br /> The C_11.61ontractor shall 111 <br /> confine operations at the site to areas permitted by applicable laws, statutes, ordinances, codes, <br /> rules Nand regulations, and lawful orders of public authorities and the Contract Documents and shall not unreasonably <br /> encumber the site with materials or equipment. <br /> ' 16 Fill 1 11 IF <br /> § 3.14 CUTTING AND PATCHING <br /> § 3.14. 1 The Contractor shall be responsible for cutting, fitting or patching required to complete .the Work or to make <br /> UH <br /> its. parts fit togett. her1 1 .properly. All areas requiring cutting, fitting and patching shall be restored to the condition <br /> 111. <br /> IF IF .: existing prior to the cutting, fitting and patching, unless otherwise required by the Contract Documents. <br /> IF <br /> 66466 61 <br /> FlI , § 3.14.2 The. Contractor shall not damage or endanger a portion of the Work or fully or partially completed <br /> 666 <br /> 6.construction of the Owner or separate contractors by cutting, patching or otherwise altering such construction, or by <br /> excavation. The Contractor shall not cut or otherwise alter such construction by the Owner or a separate contractor <br /> 1 6161.61 <br /> except with written con senf of the Owner and of such separate contractor; such consent shall not be unreasonably <br /> withheld. The Contractor shall not unreasonably withhold from the Owner or a separate contractor the Contractor' s <br /> consent to cutting or otherwise altering the Work. <br /> 1 16 <br /> § 3.15 CLEANING UP <br /> An <br /> 411.6 <br /> tt <br /> § 13, 15.1 The Contractor shall keep the premises and surrounding area free from accumulation of waste materials or <br /> rubbish caused by operationsunder the Contract. At completion of the Work, the Contractor shall remove waste <br /> materials, rubbish, the Contractor's tools, construction equipment, machinery and surplus materials from and about <br /> the Project. <br /> 1 F41 <br /> If the Contractor fails to clean up as provided in the Contract Documents, the Owner may do so and Owner <br /> shall be entitled to reimbursement from the Contractor. <br /> Fill. 11 <br /> IF <br /> IF <br /> § 3.16 ACCESS TO WORK <br /> The Contractor shall provide the Owner and Architect access to the Work in preparation and progress wherever <br /> 1166 6IF <br /> located. <br /> 66, <br /> 66 <br /> § 3.17 ROYALTIES, PATENTS AND COPYRIGHTS <br /> The Contractor shall pay all royalties and license fees. The Contractor shall defend suits or claims for infringement <br /> of copyrights and. patent rights and shall hold the Owner and Architect harmless from loss on account thereof, but <br /> shall not 'be responsible for such defense or loss when a particular design, process or product of a particular <br /> manufacturer or manufacturers is required by the Contract Documents, or where the copyright violations are <br /> 16 116 Ill 6 I ' ll 116 contained in Drawings, Specifications or other documents prepared by the Owner or Architect. However, <br />if the <br /> Contractor has reason to believe that the required design, process or product is an infringement of a copyright or a <br /> patent, the Contractor shall be responsible for such loss unless such information is promptly furnished to the <br /> Architect. <br /> Init. AIA Document A201 rm - 2007. Copyright ® 1911 , 1915, 1918, 1925, 1937, 1951 , 1958, 1981 , 1983, 1966, 1970, 1976, 1987, 1997 and <br /> 2007 by The American <br /> Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized <br /> 1 <br /> reproduction or distribution of this AIA® Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted <br /> to the <br /> maximum extent possible under the law. This document was produced by AIA software at 11 :28: 34 on 12/21 /2012 under Order No.4386727979 1 which <br /> expires on 02/05/2013, and is not for resale. <br /> User Notes: (811102568) <br /> i <br />