required to provide professional services in violation of applicable law. If professional design services or
<br /> certifications by a design professional related to systems, materials or equipment are specifically required of the
<br /> Contractor by the Contract Documents, the Owner and the Architect will specify all performance and design criteria
<br /> that such services must satisfy. The Contractor shall cause such services or certifications to be provided by a
<br /> properly licensed design professional, whose signature and seal shall appear on all drawings, calculations,
<br /> specifications, certifications, Shop Drawings and other submittals prepared by such professional. Shop Drawings
<br /> and other submittals related to the Work designed or certified by such professional, if prepared by others, shall bear
<br /> Nil
<br /> such professional ' s written approval when submitted to the Architect. The Owner and the Architect shall be entitled
<br /> to rely upon the adequacy, accuracy and completeness of the services, certifications and approvals performed or
<br /> 1 , 116 provided by such design professionals, provided the Owner and Architect have specified to the Contractor all
<br /> performance1 6 and design criteria that such services must satisfy. Pursuant to this Section 3 . 12 . 10, the Architect will
<br /> review, approve or take other appropriate action on submittals only for the limited purpose of checking for
<br /> conformance with information given and the design concept expressed in the Contract Documents. The Contractor
<br /> IF
<br /> " I FF Ishall not be responsible for the adequacy of the performance and design criteria specified in the Contract
<br /> IF; 6DOGUlnent&
<br /> 1111.6- 6 1
<br /> 16
<br /> § 3.13 USE OF SITE
<br /> The C_11.61ontractor shall 111
<br /> confine operations at the site to areas permitted by applicable laws, statutes, ordinances, codes,
<br /> rules Nand regulations, and lawful orders of public authorities and the Contract Documents and shall not unreasonably
<br /> encumber the site with materials or equipment.
<br /> ' 16 Fill 1 11 IF
<br /> § 3.14 CUTTING AND PATCHING
<br /> § 3.14. 1 The Contractor shall be responsible for cutting, fitting or patching required to complete .the Work or to make
<br /> UH
<br /> its. parts fit togett. her1 1 .properly. All areas requiring cutting, fitting and patching shall be restored to the condition
<br /> 111.
<br /> IF IF .: existing prior to the cutting, fitting and patching, unless otherwise required by the Contract Documents.
<br /> IF
<br /> 66466 61
<br /> FlI , § 3.14.2 The. Contractor shall not damage or endanger a portion of the Work or fully or partially completed
<br /> 666
<br /> 6.construction of the Owner or separate contractors by cutting, patching or otherwise altering such construction, or by
<br /> excavation. The Contractor shall not cut or otherwise alter such construction by the Owner or a separate contractor
<br /> 1 6161.61
<br /> except with written con senf of the Owner and of such separate contractor; such consent shall not be unreasonably
<br /> withheld. The Contractor shall not unreasonably withhold from the Owner or a separate contractor the Contractor' s
<br /> consent to cutting or otherwise altering the Work.
<br /> 1 16
<br /> § 3.15 CLEANING UP
<br /> An
<br /> 411.6
<br /> tt
<br /> § 13, 15.1 The Contractor shall keep the premises and surrounding area free from accumulation of waste materials or
<br /> rubbish caused by operationsunder the Contract. At completion of the Work, the Contractor shall remove waste
<br /> materials, rubbish, the Contractor's tools, construction equipment, machinery and surplus materials from and about
<br /> the Project.
<br /> 1 F41
<br /> If the Contractor fails to clean up as provided in the Contract Documents, the Owner may do so and Owner
<br /> shall be entitled to reimbursement from the Contractor.
<br /> Fill. 11
<br /> IF
<br /> IF
<br /> § 3.16 ACCESS TO WORK
<br /> The Contractor shall provide the Owner and Architect access to the Work in preparation and progress wherever
<br /> 1166 6IF
<br /> located.
<br /> 66,
<br /> 66
<br /> § 3.17 ROYALTIES, PATENTS AND COPYRIGHTS
<br /> The Contractor shall pay all royalties and license fees. The Contractor shall defend suits or claims for infringement
<br /> of copyrights and. patent rights and shall hold the Owner and Architect harmless from loss on account thereof, but
<br /> shall not 'be responsible for such defense or loss when a particular design, process or product of a particular
<br /> manufacturer or manufacturers is required by the Contract Documents, or where the copyright violations are
<br /> 16 116 Ill 6 I ' ll 116 contained in Drawings, Specifications or other documents prepared by the Owner or Architect. However,
<br />if the
<br /> Contractor has reason to believe that the required design, process or product is an infringement of a copyright or a
<br /> patent, the Contractor shall be responsible for such loss unless such information is promptly furnished to the
<br /> Architect.
<br /> Init. AIA Document A201 rm - 2007. Copyright ® 1911 , 1915, 1918, 1925, 1937, 1951 , 1958, 1981 , 1983, 1966, 1970, 1976, 1987, 1997 and
<br /> 2007 by The American
<br /> Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized
<br /> 1
<br /> reproduction or distribution of this AIA® Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted
<br /> to the
<br /> maximum extent possible under the law. This document was produced by AIA software at 11 :28: 34 on 12/21 /2012 under Order No.4386727979 1 which
<br /> expires on 02/05/2013, and is not for resale.
<br /> User Notes: (811102568)
<br /> i
<br />
|