be at variance with the Contract Documents. Subcontractors will similarly make copies of applicable portions of <br /> such documents available to their respective proposed Sub-subcontractors. <br /> § 5.4 CONTINGENT ASSIGNMENT OF SUBCONTRACTS <br /> § 5.4. 1 Each subcontract agreement for a portion of the Work is assigned by the Contractor to the Owner, provided <br /> that 11 <br /> IL <br /> . 1 assignment is effective only after termination of the Contract by the Owner for cause pursuant to <br /> I -ILL <br /> It I <br /> Section 14.2 and only for those subcontract agreements that the Owner accepts by notifying the <br /> SI'LL Iubcontractor and Contractor in writing; and <br /> I -ILL <br /> V ILL <br /> IL <br /> .2 assignment is subject to the prior rights of the surety, if any, obligated under bond relating to the <br /> Contract. <br /> When the Owner accepts the assignment of a subcontract agreement, the Owner assumes the Contractor ' s rights and <br /> It <br /> obligations under the subcontract. <br /> § 5.4.2 Upon such assignment,� if the Work has been suspended for more than 30 days, the Subcontractor' s <br /> compenILL <br /> sation shall be equitably adjusted for increases in cost resulting from the suspension. <br /> L ILL <br /> I ILL <br /> § 5.4.3 :Upon such assignment to the Owner under this Section 5 .4, the Owner may further assign the subcontract to a <br /> ILLsuccessor contractor or other entity. If the Owner assigns the subcontract to a successor contractor or other entity, <br /> thII <br /> I - LLe Owner shall nevertheless remain legally responsible for all of the successor contractor' s obligations under the <br /> It LKII <br /> subcontract. VI.11 ILL <br /> ARTICLE 6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS <br /> § 61 OWNER'S RIGHTi4TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS <br /> § 6.1 .1 The Owner reserves the right to perform construction or operations related to the Project with the Owner' s <br /> own forces, and to award separate contracts in connection with other portions of the Projector other construction or <br /> operations on the site under Conditions of the Contract identical or substantially similar to these including those <br /> portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is <br /> iIt- nvolved becauseI' LL of such action by the Owner, the Contractor shall make such Claim as provided in Article 15 . <br /> I ILL <br /> § 6.1 .2 When separtI ate contracts are awarded for different portions of the Project or other construction or operations <br /> on th'e site, the; terrn '"Contractor" 1 the Contract Documents in each case shall mean the Contractor who executes <br /> I -LL <br /> each separate Owner-Contractor Agreement. <br /> § 6, 1 ,3 ,.Th6 Owner shall provide for coordination of the activities of the Owner' s own forces and of each separate <br /> contractor with the Work of the Contractor, who shall cooperate with them. The Contractor shall participate with <br /> I 'LL ILL 11 other separate contractors and the Owner in reviewing their construction schedules. The Contractor shall make any <br /> LL <br /> revisions to, the consK" Ltruction LLLschedule deemed necessary after a joint review and mutual agreement. The construction <br /> ILL I <br /> LLL LL <br /> schedules shall then constitute the `schedules to be used by the Contractor, separate contractors and the Owner until <br /> ILL <br /> subsI 'LLequently revised. <br /> LL I <br /> § 6.1 .4 Unless otherwise provided in the Contract Documents, when the Owner performs construction or operations <br /> related to the Project with the Owner' s own forces, the Owner shall be deemed to be subject to the same obligations <br /> I IV <br /> ILL <br /> I LL <br /> LL <br /> and to have the same rights that apply to the Contractor under the Conditions of the Contract, including, without <br /> excluding oCLLthers, those stated in Article 3 , this Article 6 and Articles 10, 11 and 12. <br /> ILL <br /> ILLLL <br /> § 6.2 MUTUAL RESPONSIBILITY <br /> § 42,1. The Contractor shall afford the Owner and separate contractors reasonable opportunity for introduction and <br /> storage of their materials and equipment and performance of their activities, and shall connect and coordinate the <br /> ILL <br /> Contractor's construction and operations with theirs as required by the Contract Documents. <br /> IN, § 6.2.2 If part of the Contractor' s Work depends for proper execution or results upon construction or operations by <br /> the Owner or a separate contractor, the Contractor shall, prior to proceeding with that portion of the Work, promptly <br /> report to the Architect apparent discrepancies or defects in such other construction that would render it unsuitable <br /> for such proper execution and results. Failure of the Contractor so to report shall constitute an acknowledgment that <br /> Inst AIA Document A201 TM — 2007. Copyright ® 1911 , 1915, 1918, 1925, 1937, 1951 , 1958, 1961 , 1963, 1966, 1970, 1976, 1987, 1997 and <br />2007 by The American <br /> Institute of Architects. All rights reserved. WARNING : This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized <br /> 2 <br /> reproduction or distribution of this AIA® Document, or any portion of it, may result In severe civil and criminal penalties, and will be prosecuted <br /> to the <br /> maximum extent possible under the law. This document was produced by AIA software at 11 :28:34 on 12/21 /2012 under Order No.4386727979 1 which <br /> expires on 02/05/2013, and is not for resale. <br /> User Notes: (811102566) <br />