My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 1:49:43 PM
Creation date
10/1/2015 4:59:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/18/2012
Control Number
2012-227A
Agenda Item Number
8.Q.
Entity Name
Proctor Construction Company
Subject
Crime Scene Facility
Renovation of Warehouse
Area
3885 4th Street
Bid Number
201311
Supplemental fields
SmeadsoftID
11694
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§ 8.4 The Contractor ' s representative: <br /> (Name, address and other information) <br /> Donald L. Tolliver <br /> 2050 US Hwy 1 , Suite 200 <br /> Vero Beach, FL 32960 <br /> Telephone Number: 772-234-8164 <br /> Fax Number: 772-2348188 <br /> § 8.5 Neither the Owner' s nor the Contractor ' s representative shall be changed without ten days written notice to the <br /> other party. <br /> § 8.6 Other provisions: <br /> r <br /> ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS <br /> § 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in <br /> the sections below. <br /> § 9.1 .1 The Agreement is this executed AIA Document A101-2007, Standard Form of Agreement Between Owner <br /> and Contractor. <br /> §: 9.1 .2 The General Conditions are AIA Document A201 -2007, General Conditions of the Contract for <br /> Construction. <br /> § 9.1 .3 The Supplementary and other Conditions of the Contract: <br /> Document Title Date Pages <br /> I Supplementary General See Specification 11 /02/ 12 modified by 16 <br /> Conditions Section 00800 Addendum on 11 / 16/ 12 <br /> § 9.1 .4 The Specifications. <br /> (Either list the Specifications here or refer to an exhibit attached to this Agreement.) <br /> See attached Exhibit "C" List of Drawings and Specification <br /> Section Title Date Pages <br /> § 9.1 .5 The Drawings: <br /> (Either list the Drawings here or refer to an exhibit attached to this Agreement.) <br /> . See attached Exhibit "C" List of Drawings and Specification <br /> Number Title Date <br /> § 9. 1 .6 The Addenda, if any: <br /> Number Date Pages <br /> Addendum # 1 November 15, 2012 41 <br /> Addendum # 2 November 26, 2012 4 <br /> Addendum # 3 November 27, 2012 7 <br /> Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding <br /> requirements are also enumerated in this Article 9. <br /> Inst. AIA Document A101 '"' - 2007. Copyright © 1915, 1918, 1925, 1937, 1951 , 1958, 1961 , 1963, 1967, 1974, 1977, 1987, 1991 , 1997 and <br /> 2007 by The American <br /> Institute of Architects. All rights reserved. WARNING: This AIA® Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized <br /> 6 <br /> reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted <br /> to the <br /> maximum extent possible under the law. This document was produced by AIA software at 11 :27: 11 on 12/21/2012 under Order No.4386727979_1 which <br /> expires on 02/05/2013, and is not for resale. <br /> User Notes: (1381196135) <br />
The URL can be used to link to this page
Your browser does not support the video tag.