My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-113a
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-113a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2015 12:07:54 PM
Creation date
10/1/2015 5:22:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
06/18/2013
Control Number
2013-113a
Agenda Item Number
12.I.2
Entity Name
Proctor Construction Company
Subject
Change Order No.2 Prime Contract Change Order
IRCSO Vehicle Storage Facility
Area
Indian River Crime Scene Investigation Facility
Project Number
IRC-CS101/2013
Supplemental fields
SmeadsoftID
11998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTES: <br /> 1 . The option for galvanizing Is for the primary and secondary framing on the open area only. <br /> Keep In mind, anytime we do an open building like this, I try to stress for what It will cost to <br /> paint all the steel plus the cost in maintaining it every four years or so, the owner could of just <br /> went with the Galvanized and saved a lot of money in the long run. <br /> 2 . There Is going to be a $7.00/Yd. Increase in ready mixed concrete beyond July 1s` on any work <br /> that Is not secured by an existing written agreement. <br /> I <br /> Not Included . <br /> • Permits <br /> • Site work <br /> • Exterior concrete work <br /> • Bollards — It Is recommended that bollards be used to protect the columns and framed ' <br /> openings <br /> Overhead door, windows, louvers, exhaust fans <br /> I <br /> PAYMENT SCHEDULE: Invoices due 10 days after date of invoice . All past due amounts are subject to 2% <br /> per month late charge. <br /> All agreements are contingent upon strikes , accidents or delays beyond our control . All work is to be i <br /> completed in a workmanlike manner. Any alteration or deviation from above specifications involving extra <br /> costs will be executed only upon written orders, and will become an extra charge over and above the estimate. <br /> This proposal is subject to acceptance within 30 days and is void thereafter at the option of the undersigned. <br /> RF CONCRETE CONSTRUCTION, INC. <br /> I; <br /> Authorized Signature: I <br /> ACCEPTANCE OF PROPOSAL: The above prices , specifications and conditions are hereby accepted . You <br /> are authorized to do the work as specified . <br /> DATE OF ACCEPTANCE: SIGNATURE. <br /> I <br /> I <br /> j <br /> i <br /> I <br /> IRC Sheriffs Crime Scene Facility 2 <br /> Storage Building <br /> Proposal <br />
The URL can be used to link to this page
Your browser does not support the video tag.