Laserfiche WebLink
I <br /> Area <br /> ® Proctor <br /> COMMOOOII OM (GSF) <br /> GMP Estimate 111000 f <br /> IRC Crime Scene Vehicle Storage I <br /> I <br /> Cost: Cost/Sq. Ft. <br /> I <br /> Sitework Landsca in Allowance 14,068 1 .28 <br /> Sitework-Irri ation Allowance 4 000 0.36 t <br /> SiteworkaBuilding Pad 13 000 1018 E <br /> Sitework-Cut Fill and Grade 37 000 3 .36 <br /> Sitework Storm Drainage & Structures 21650 1 .97 <br /> Sitework IOOLF I " Poly, Tie to Existing 950 0.09 <br /> Site Pavin 8" Stabilization 5 900 034 <br /> Site Pavin - 6" Coguhm Rock 10,925 0.99 <br /> Site NAM 1 .5" S-I Asphalt 19 320 1 .76 <br /> Usuveying 2 200 0.20 <br /> ChainaLink Fencing 17 529 1 .59 <br /> Concrete Slab Dimension 80' x125' 72j900 6.03 <br /> Masonry N/A N/A <br /> Metal-Bollard Allowance 3,500 0.32 <br /> Metal Build ' 80 x 125 BUM N/A <br /> BLUA Carpentry N/A NIA s <br /> Cabinctry and Finish Carpentry N/A N/A <br /> Roofing in Metal Bui in Metal Building <br /> Exterior Doors and Roll-up 0 410 N/A <br /> Drywall N/A N/ <br /> Acoustical Ceiling Tile N/A NIA <br /> Flooring NIA N/A <br /> Final Cleaning NIA N/A <br /> Toilet Accessories & Specialities N/A N/A <br /> Plumbing Allowance N/A N/A <br /> Fire Protection 31000 N/A j <br /> HVAC Allowance 41000 N/A <br /> Electrical Allowance 17 200 1 .56 i <br /> Subtotal Direct Cost 4149568 37.69 <br /> Construction/Desi Contingency 5% 20,728 NI <br /> Permit Fees NIC NI <br /> General Conditions 33 165 3.02 <br /> Builder's Risk NIC NIC <br /> OU Auto Insurance 2 695 0.24 <br /> P&P Bond 4192 0.38 <br /> 1 <br /> Subtotal 475r348 43 .21 <br /> Fee 23o767 2 . 16 j <br /> Total Cost 4999115 45.37 <br /> - i <br /> I <br />