Laserfiche WebLink
REQUEST FOR CHANGE <br /> DATE: 5/17/2013 <br /> RFC# 7 <br /> FROM: COMPLETE ELECTRIC, INC <br /> COMPANY NAME: PROCTOR CONSTRUCTION CO <br /> ADDRESS: 2050 US HWY 1 , STE 200 <br /> VERO BEACH, FL 32960 <br /> PHONE: 772-234-8164 <br /> FAX: 772-234-8188 <br /> EMAIL: NBISCHOFMPROCTORCC.COM <br /> PROJECT NAME: IRC CRIME SCENE BLDG <br /> This change must be signed and approved before any material Is ordered and any associated work Is completed. <br /> SCOPE: Provide labor and materials for changes detailed below per Electrical Changes REV 3 dated 5/14/13 <br /> Bring two new home run circuits to Photo Studio <br /> Relocate CU runs (4) no cost <br /> ' Shorten CU runs (4) and Issue credit <br /> MATERIALS: DESCRIPTION QTY EACH PRICE TOTAL <br /> jj 12 THHN CU SOLID 465 $0.10 $46.50 <br /> 2 PULL LINE 200 LB 0.0026 $67.55 $0.18 <br /> 3 3/4 EMT COUP DIS 12 $0,31 $3.72 <br /> 6 3A EMT 1 HOLE STP/STL 18 0.07 $1A2 <br /> 7 3/4 BUSH PLASTIC 2 $0.07 $0.14 <br /> s IDEAL 451 YELLOW WIRE NUT 6 0.08 $0.48 <br /> 9 IDEAL 452 RED WIRE NUT 8 $0.11 $0.88 <br /> 16 4SQ 2-118" BOX 112+314TKO 2 $0.93 . $1 .86 <br /> 31 GROUND SCREW/#12 PIGTAIL 2 $0.30 $0.60 <br /> 12 #8x1 /2 WAFR LATH TEK act 14 $0.02 $0.28 <br /> is 1 /4xl -1 /4 W TE CONCRETE act 9 0.07 0.63 <br /> 14 TOTAL-_ - - -- - - - - - - - - - - -- - -__ - $56.39 <br /> is 10 THHN CU STRANDED 1476 $0. 17 $250.92 <br /> 16 3/4 PVC 40 400 0. 17 $68.00 <br /> 17 TOTAL CREDIT - - - - - - - - ._._... - - - $318.92 <br /> SUBTOTAL: -$262.53 <br /> 7% TAX: $0.00 <br /> TOTAL MATERIALS: 4262.53 <br /> LABOR: NEW <br /> GENERAL FOREMAN 0 hrs. @ $36.89 per hr. = $0.00 <br /> FOREMAN 0 hrs. @ $34.42 per hr. = $0.00 <br /> JOURNEYMAN 8 hrs. @ $30.75 per hr. = $246.00 <br /> APPRENTICE 8 hrs. @ $19.66 per hr. = $157.28 <br /> LABORER 0 hrs. @ $14.75 per hr, = $0.00 <br /> LABOR SUBTOTAL: $403.28 <br /> LABOR: CREDIT <br /> GENERAL FOREMAN 0 hrs. @ $36.89 per hr. = $0.00 <br /> FOREMAN 0 hrs. @ $34.42 per hr. = $0.00 <br /> JOURNEYMAN 2 hrs. @ $30.75 per hr, = $61 .50 <br /> APPRENTICE 2 hrs. @ $19.66 per hr, = $39.32 <br /> LABORER 0 hrs. @ $14.75 per hr. = $0.00 <br /> LABOR SUBTOTAL: $100.82 <br /> ADJ LABOR $302.46 <br /> MATERIALS AND LABOR SUBTOTAL: $39.93 <br /> MARK-UP: (work by contractor) <br /> OVERHEAD: 10% $3.99 <br /> PROFIT: 5% $2.20 <br />