Laserfiche WebLink
Photography Equipment per Keyed <br /> Note 08 on sheet A2 . 11 , and the <br /> plywood decking on the framed <br /> platforms per section details 1 , 2, 3 on <br /> sheet A4 .21 from non fire retardant <br /> plywood <br /> 012 Add for (2) Laminated 42" x 20" bench $300.00 BRAKIT <br /> seats <br /> 013 Added Electrical/Data/Receptacles in $2,830.00 CELEC <br /> CSI Conference Rm, Imaging Rm. <br /> Computer Rm, Photo Study, Training <br /> Rm, Rm 116 per Sheriff Department <br /> request in on-site walk-thru. <br /> 014 Provide added power for the AHU- 10 $849 .39 CELEC <br /> and Exhaust Fan <br /> 015 Added Galvanized Panels in Areas $ 19078. 00 PP <br /> exposed not included in previous PCO <br /> 016 Provide (2) new home run circuits to $276.65 CELEC <br /> Photo, Relocate CU runs (4), Credit for <br /> Shortened CU run. Add One ( 1 ) 30 <br /> amp Twist Lock Receptacle <br /> 017 Relocated AHU extended electrical $225 .57 CELEC <br /> conduit and wire 50'. <br /> 018 RFI 18- Changes to New Sanitary Line $29423 .00 CATHCO <br /> due to invert out of the building <br /> lowering <br /> 019 Owner Contingency Credit # 2- ($75212 .30) PCC <br /> Balance $7,212 . 30 <br /> Level 1 10 .00% Overhead Markup $6, 196.98 <br /> Level 2 5 .00% Profit Markup $3 ,408 . 34 <br /> Level 3 1 .00% Insurance Markup $ 715 .75 <br /> Level 4 1 .00% Bond Markup $ 722 .91 <br /> Total Amount $731013.73 <br /> Days Requested 0 <br /> This Change Order Request includes but is not limited to, the following qualifications and/or <br /> clarifications: <br /> 1 . Work specifically outlined within the summary included in each subcontractors change order <br /> request. <br /> 2. This proposal includes the building department comments included in the permit drawings <br /> dated 14443 . <br /> 3 . This proposal includes a credit against the Owner Contingency of $ 7,212 .30. The Owner <br /> contingency has now been reduced to $0. <br /> 4 . <br /> If you have any questions regarding this Change Order Request, please call me at your earliest <br /> convenience, <br /> Respectfully, <br /> Nick Bischoff <br /> Project Manager <br /> Please sign below signifying approval to proceed with the above stated scope of work. <br /> Architect Date <br /> Owner Date <br />