My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-134
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-134
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2015 9:54:21 AM
Creation date
10/1/2015 5:23:10 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
07/16/2013
Control Number
2013-134
Agenda Item Number
8.K.
Entity Name
Proctor Construction Co.
Donadio & Associates
Subject
Change Order No. 3
Evidence Compound Building Department Changes
Area
Crime Scene Facility
Supplemental fields
SmeadsoftID
12011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER <br /> RF CONCRETE CONSTRUCT[l0 1, INC. <br /> P. O. Box 650789, Vero Beach, Florida 32965 <br /> 664 Old Dixie Highway, Vero Beach, Florida 32962 <br /> Phone: 772-567-33561 Fax: 772- 778-2942 <br /> Change Order Submitted to Project Name Date <br /> Proctor Construction Company IRC Sheriff's Crime Scene Facility April 23 , 2013 _ <br /> Street Project Location Change Order Number 9 <br /> _2050 US Hwy. 1 , Suite 200 Vero Beach , FL . (REVISED) <br /> City, State and Zip Telephone <br /> Vero Beach , FL. 32960 772-234-8164 <br /> Attn: Fax: Email: <br /> Nick Bischoff 772-234-8188 nbischoff@proctorcc. com <br /> We hereby agree to make the change(s) specifled below: <br /> Supply 4 Install Metal Rullding Components to support new AHV and frame openings for added Louvers /n a <br /> finished wall. <br /> 0 supply & install 8" 16GA . Purlins @ 24' - 0" long to support AHU - 10 . <br /> 0 Supply 8, install ( 2 ) Framed Openings for a 24" x 24" Louver . <br /> 0 Cut out Wall Panel and Insulation inside new openings <br /> © supply & install J - Trim around all Framed Openings . <br /> 0 8" C - Channel with Clips will be used for all Framed Openings . <br /> 0 All misc . Bolts , Nuts , Screws , welding , Etc . , are included <br /> 0 All Taxes , Freight and Trim Box <br /> MATERIAL TOTAL - $ 1 , 550 , 60 <br /> LABOR TOTAL - $ 2 , 400 . 00 <br /> TRIM BOX A FREIGHT COST - $475 . 00 <br /> TOTAL - $ 40425 . 60 <br /> 15 % OHAP - 663 . 34 <br /> CHANGE ORDER TOTAL - $ 5 , 039 . 44 <br /> NOT-INCLUDED : <br /> a 8 " and 6" Exhaust/intakes <br /> 0 Damper <br /> We hereby agree to make the changes (s) specified above at this price : $5 , 318 . 75 <br /> Previous Contract Amount : <br /> Revised Contract Amount . <br /> RF CONCRETE CONSTRUCTION , INC . Authorized Signature <br /> ACCEPTANCE OF CHANGE ORDER - The above prices and specifications of this Change Order are satisfactory and are <br /> hereby accepted. All work to be performed under the same terms and conditions as specified in original contract unless otherwise <br /> stipulated. <br /> DATE OF ACCEPTANCE : SIGNATURE : <br />
The URL can be used to link to this page
Your browser does not support the video tag.