My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-298
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-298
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2016 12:00:50 PM
Creation date
10/1/2015 1:28:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/07/2010
Control Number
2010-298
Agenda Item Number
8.N.
Entity Name
Timothy Rose Contracting
Subject
Quail Creek Subdivision
Area
Quail Creek Subdivision
Project Number
2004020196-45291
Bid Number
2011012
Supplemental fields
SmeadsoftID
9143
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 . Drawings—That part of the Contract completion date or time prior to Substantial Comple- <br /> Documents prepared or approved by ENGINEER tion of all the Work . <br /> which graphically shows the scope , extent , and <br /> character of the Work to be performed by 28 . Notice of Award--The written notice by <br /> CONTRACTOR . Shop Drawings and other OWNER to the apparent successful bidder stating that <br /> CONTRACTOR submittals are not Drawings as so upon timely compliance by the apparent successful <br /> defined . bidder with the conditions precedent listed therein , <br /> OWNER will sign and deliver the Agreement. <br /> 18 . Effective Date of the Agreement--The <br /> date indicated in the Agreement on which it becomes 29: Notice to Proceed--A written notice given <br /> effective , but if no such date is indicated , it means the by OWNER to CONTRACTOR fixing the date on <br /> date on which the Agreement is signed and delivered which the Contract Times will commence to run <br /> and <br /> by the last of the two parties to sign and deliver. on which CONTRACTOR shall start to perform the <br /> 19 . ENGINEER—The individual or entity Work under the Contract Documents . <br /> named as such in the Agreement. 30 . OWNER--The individual , entity , public <br /> body , or authority with whom CONTRACTOR has <br /> 20 . ENGINEER 's Consultant--An individual or entered into the Agreement and for whom the Work is <br /> entity having a contract with ENGINEER to furnish to be performed . <br /> services as ENGINEER ' s independent professional <br /> associate or consultant with respect to the Project and 31 . Partial Utilization— Use by OWNER of a <br /> who is identified as such in the Supplementary substantially completed part of the Work for the pur- <br /> Conditions , pose for which it is intended ( or a related purpose) <br /> prior to Substantial Completion of all the Work . <br /> 21 . Field Order—A written order issued by <br /> ENGINEER which requires minor changes in the 32 . PCBs-- Polychlorinated biphenyls . <br /> Work but which does not involve a change in the <br /> Contract Price or the Contract Times . 33 . Petroleum--Petroleum , including crude oil <br /> or any fraction thereof which is liquid at standard <br /> 22 . General Requirements--Sections of conditions of temperature and pressure (60 degrees <br /> Division 1 of the Specifications . The General Fahrenheit and 14 . 7 pounds per square inch <br /> Requirements pertain to all sections of the Specifica- absolute ) , such as oil , petroleum , fuel oil , <br /> oil sludge , oil <br /> tions . refuse , gasoline , kerosene , and oil mixed with other <br /> non - Hazardous Waste and crude oils . <br /> 23 . Hazardous Environmental Condition --The <br /> presence at the Site of Asbestos , PCBs , Petroleum , 34 . Project—The total construction of which <br /> Hazardous Waste , or Radioactive Material in such the Work to be performed under the Contract <br /> quantities or circumstances that may present a Documents may be the whole , or a part as may <br /> be <br /> substantial danger to persons or property exposed indicated elsewhere in the Contract Documents . <br /> thereto in connection with the Work . <br /> 35 . Project Manual—The bound documentary <br /> 24 . Hazardous Waste—The term Hazardous information prepared for bidding and constructing the <br /> Waste shall have the meaning provided in Section Work . A listing of the contents of the Project Manual , <br /> 1004 of the Solid Waste Disposal Act (42 USC which may be bound in one or more volumes , is <br /> Section 6903) as amended from time to time . contained in the table ( s ) of contents . <br /> 25 . Laws and Regulations; Laws or Regulat 36 . Radioactive Material—Source , special <br /> ions--Any and all applicable laws , rules , regulations , nuclear, or byproduct material as defined by the <br /> ordinances , codes , and orders of any and all govern - Atomic Energy Act of 1954 (42 USC <br /> Section 2011 et <br /> mental bodies , agencies , authorities , and courts seq . ) as amended from time to time . <br /> having jurisdiction . <br /> 37 . Resident Project Representative—The <br /> 26 . Liens—Charges , security interests , or authorized representative of ENGINEER who may be <br /> encumbrances upon Project funds , real property , or assigned to the Site or any part thereof. <br /> personal property . <br /> 38 . Samples—Physical examples of <br /> 27 . Milestone--A principal event specified in materials , equipment, or workmanship that are <br /> the Contract Documents relating to an intermediate representative of some portion of the Work and which <br /> 00700. - General Conditions. doc <br /> 00700 - 6 <br /> FAEngineeringlLand Development PermitslQuail Creek PD\Bid-Contract Documents100700 - General Conditions. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.