My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-298
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-298
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2016 12:00:50 PM
Creation date
10/1/2015 1:28:47 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLARIFICATIONS / CORRECTIONS : <br /> The following pay item under the Itemized Bid Schedule has been revised accordin I <br /> L Itemized Bid Schedule — Item # 39 " Concrete Sidewalk - Internal Roads " . The qua t t for this item <br /> is reduced from 3 , 367 square yards to 89 square yards . y <br /> Also as a part of the subject addendum , the following plan sheet has been added : <br /> 1 . Plan Sheet C2 of 7 . Sections A - A through I - 1 were not provided . Please refer to sections <br />on Sheet <br /> C3A provided with this Addendum . <br /> Also as a part of the subject , addendum questions raised by plan holders and answers to those <br /> questions are indicated below : <br /> 1 . Specification Item # 11 " Excavation " . This item is intended to include excavation necessary in <br /> borrow stockpiles on site . <br /> 2 . Plan Sheet C3 of 6 . Sections from Station 0+ 50 through Station 7 + 30 were not provided . Please <br /> refer to plan Sheet C4 for cross sections of western lot fill . <br /> 3 . Itemized Bid Schedule — Item # 8 " Clearing and Grubbing " . Bidder ' s attention is also called to <br /> " Includes Removal of Dead Units " at the bottom of the Itemized Bid Schedule . <br /> 4 . Itemized Bid Schedule — Item #27 " Canopy Tree " , Item #2B " Understory Tree " and Item #29 <br /> " Hedge/ Shrub " . The quantities for each of these items reflect current estimates as of this date . The <br /> quantities shown on the plan sheet L - 1 were for the original construction that was completed . <br /> 5 . Plan sheet 7 of 14 Typical Roadway Section . The sod shown to be installed along both sides <br />of the <br /> roadway has been completed . No sod in these areas is included in the bid item . <br /> 6 . Specification Section 01215 — General Quality Control — Section 1 . 2 . A . The owner will employ <br /> and pay for testing services as noted in SC - 13 . 03 of the Special Conditions . <br /> ATTACHMENTS : <br /> L Plan Sheet C3A . <br /> 2 . Itemized Bid Schedule dated November 3 , 2010 <br /> - 2 — <br /> F: IEngineeringlLarrd Development PermitslQuail Creek PDIBid- Contract DocumentslAddendumslAddendum #Ldoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.