My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-028A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-028A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 2:54:28 PM
Creation date
10/1/2015 5:58:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/11/2014
Control Number
2014-028A
Agenda Item Number
8.H.
Entity Name
R.J. Sullivan Corp.
Subject
Central WWTP Sludge Holding Tank Modification
Project Number
IRC No.2014006
Supplemental fields
SmeadsoftID
13063
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00530 - EJCDC <br />STANDARD FORM OF AGREEMENT <br />BETWEEN OWNER AND CONTRACTOR <br />ON THE BASIS OF A STIPULATED PRICE <br />O3/itjao14 <br />8.N• <br />QOHI. oaS <br />THIS AGREEMENT ("Agreement" or "Contract"), dated the thday of March in the <br />year 201 by and between Indian River County, a political subdivision of the State of Florida <br />(hereinafter called OWNER) and R.J. Sullivan Corp. ..(hereinafter called <br />CONTRACTOR). pt <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />• <br />ARTICLE 1 WORK <br />CONTRACTOR as an independent contractor and not as an employee shall furnish and complete <br />all of the necessary labor, material, and equipment to perform the work as specified or indicated <br />in the Contract Documents. The work is generally described as follows: <br />• <br />A. CONTRACTOR shall complete all work as specified or indicated in the Contract <br />Documents The work is generally described as follows which shall include, but is not <br />n ecessarily limited to the following <br />1 <br />Indian River County (IRC) proposes to demolish and remove useless equipment, <br />appurtenances, and piping and construct a new sludge recirculation system and tank <br />truck filling facilities related to the existing sludge holding tanks at the Central Sub - <br />regional Wastewater Treatment Plant Facility. An important element of the project will <br />be the necessity for the contractor to conduct his work in a manner which will allow the <br />continuation of sludge handling and removal operations at the treatment plant. There <br />are two (2) existing concrete sludge holding tanks at the plant which store waste <br />activated sludge which is pumped on a regular basis into tank trucks: <br />The project consists of, but is not limited to: demolition and removal of all odor <br />control system tanks, pumps piping and appurtenances located west of the existing <br />sludge holding tanks; demolition of useless piping, equipment and appurtenances <br />located on the concrete top of the sludge holding tanks as shown on the plans; <br />demolition and removal of pumps, piping, and appurtenances on the south and east <br />e nd of the existing sludge holding tanks as shown on the plans relocation of the <br />existing sludge drum thickener unit with necessary appurtenances and piping as shown <br />o n the plans; cleaning the interior of both sludge holding tanks; preparation and coating <br />the interior walls and ceiling of each of the sludge holding tanks; preparation and <br />painting of exterior walls of the sludge holding .tanks; construction of a tnplex <br />recirculation pump system and tank truck filling facility along with necessary valves, <br />piping, flow meter as shown on the plans; furnish and install level sensing units; provide <br />all necessary electrical equipment and devices as shown on the electrical plans; <br />provide all concrete slabs and site work shown on the plans; and all other items as <br />required for an operational project <br />B. The OWNER shall have the option of direct purchase of all material and equipment for the <br />project in accordance with Rule 12A-1.094 of the Florida Administrative Code. The <br />contractor will be responsible for preparing the purchase documents for purchasing by the <br />owner The contractor will be responsible for scheduling, receiving, handling,and storage <br />of all direct purchase material and equipment. <br />00530-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.