My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-028A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-028A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 2:54:28 PM
Creation date
10/1/2015 5:58:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/11/2014
Control Number
2014-028A
Agenda Item Number
8.H.
Entity Name
R.J. Sullivan Corp.
Subject
Central WWTP Sludge Holding Tank Modification
Project Number
IRC No.2014006
Supplemental fields
SmeadsoftID
13063
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
not as a penalty) CONTRACTOR shall pay OWNER Four Hundred Fifty Dollars <br />($450.00) for each day that expires after the time specified in Paragraph 3.1 for <br />Completion. <br />3.3.1. The CONTRACTOR and OWNER agree that OWNER is authorized to deduct all <br />or any portion of the above -stated liquidated damages due to the Owner from <br />payments due to the Contractor; or, in the alternative, all or any portion of the <br />above -stated liquidated damages may be collected from the Contractor or its <br />Surety or Sureties. These provisions for liquidated damages shall not prevent the <br />OWNER, in case of the CONTRACTOR's default, from terminating the <br />Contractor's right to proceed as provided in this Agreement. <br />3.3.2. In addition to the above -stated liquidated damages, the CONTRACTOR shall be <br />responsible for reimbursing OWNER for all costs incurred by OWNER to third party <br />consultants in administering the Project beyond the Substantial Completion date <br />specified in this Agreement or beyond an approved extension of time granted to <br />CONTRACTOR, whichever date is later. <br />ARTICLE 4 CONTRACT PRICE <br />4.1 OWNER shall pay CONTRACTOR for completion of the work in accordance with the <br />Contract Documents in current funds in the amount of $654,000.00 <br />4.2 Any direct purchase material and equipment will be deducted from the lump sum price <br />specified in Article 4, 4.1 plus all applicable sales tax. <br />ARTICLE 5 PAYMENT PROCEDURES <br />CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the <br />General Conditions. Applications for Payment will be processed by ENGINEER as provided in the <br />General Conditions and the Contract Documents. <br />5.1 Progress Payments. The OWNER shall make progress payments to the CONTRACTOR <br />on the basis of the approved partial payment request as recommended by ENGINEER in <br />accordance with the provisions of the Local Government Prompt Payment Act, Florida <br />Statutes section 218.70 et. seq. The OWNER shall retain ten percent (10%) of the <br />payment amounts due to the CONTRACTOR until fifty percent (50%) completion of the <br />work After fifty percent (50%) completion of the work is attained as certified to OWNER by <br />ENGINEER in writing, OWNER shall retain five percent (5%) of the payment amount due <br />to CONTRACTOR until final completion and acceptance of all work to be performed by <br />CONTRACTOR under the Contract Documents. Pursuant to Florida Statutes section <br />218.735(8)(b), fifty percent (50%) completion means the point at which the County as <br />OWNER has expended fifty percent (50%) of the total cost of the construction services <br />work purchased under the Contract Documents, together with all costs associated with <br />existing change orders and other additions or modifications to the construction services <br />work provided under the Contract Documents. <br />5.2 Pay Requests Each request for a progress payment shall be submitted on the application <br />for payment form supplied by OWNER and the application for payment shall contain the <br />CONTRACTOR's certification. All progress payments will be on the basis of progress of <br />the work measured by the schedule of values established, or in the case of unit price work <br />based on the number of units completed. After fifty percent (50%) completion, and <br />pursuant to Florida Statutes section 218.735(8)(d), the CONTRACTOR may submit a pay <br />00530-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.