My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-028A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-028A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 2:54:28 PM
Creation date
10/1/2015 5:58:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/11/2014
Control Number
2014-028A
Agenda Item Number
8.H.
Entity Name
R.J. Sullivan Corp.
Subject
Central WWTP Sludge Holding Tank Modification
Project Number
IRC No.2014006
Supplemental fields
SmeadsoftID
13063
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rj S <br />iliv Corp. <br />GENERAL CONTRACTOR <br />March 20, 2014 <br />Ms. Jennifer Hyde, Purchasing Manager <br />Indian River County <br />1800 27th Street <br />Vero Beach, FL 32960 <br />Re: Indian River County Bid No. 2014006 <br />Central WWTP Sludge Holding Tank Modifications <br />Agreement between Owner & Contractor <br />Dear. Ms. Hyde, <br />We are returning two copies of the Agreement as well as the Public Construction Bond <br />and Certificate of Insurance as requested. <br />We want to express our concern that the time allotted for the project is inadequate and <br />the job can't be completed within the time stated in Article 3.1 of the Agreement for the <br />following reasons. <br />(a) 1. We are allowed 30 days to obtain permits. We can submit an application for <br />permit to the building department, but we have no control over how long it takes <br />to review the application and issue the permit. <br />(a) 2. & 5 Most of the materials specified will take 2 to 4 weeks to provide shop <br />drawings plus the time required by the engineer to review and approve them. <br />(a) 7. It is impossible to have all material delivered to the job in the first 30 days. <br />Some of the specialty equipment may take as long as 70 days after approval by <br />the engineer. <br />(b) We are allowed only 120 calendar days after permit to reach substantial <br />completion. If the time required receiving the specialty equipment is 70 days, <br />only 50 calendar days remain to finish the work Furthermore, there is a <br />constraint which requires that only one sludge holding tank can be out of service <br />at a time. That leaves only 25 calendar days per tank which is not enough time to <br />complete the work. <br />2001 N.W. 22nd Street o Pompano Beach, FL 33069 <br />Phone 954-975-0388 • Fax 954-975-3333 <br />
The URL can be used to link to this page
Your browser does not support the video tag.