Laserfiche WebLink
Sector 3 Beach & Dune Restoration Project Attachment 1 to Change Order No . I <br /> Indian River County <br /> Sector 3 Beach & Dune Restoration Project <br /> Attachment 1 to Change Order No . 1 <br /> The following are additions , deletions , changes and/or clarifications to the Technical <br /> Specifications for the Work . Note that : <br /> ■ The underlined text is ADDED text . <br /> ■ The stfi$ken text is DELETED text . <br /> Item 1 : Technical Specifications — Section 1 . 1 General <br /> Section 1 . 1 is amended as follows : <br /> 1 . 1 General. The CONTRACTOR shall provide all plant, labor, equipment, supplies , <br /> and materials to perforin all operations in connection with excavating , <br /> transporting, placing and grading (and tilling if directed) of sand fill on Indian <br /> River County beaches as specified herein and as indicated on the Drawings titled <br /> " Sector 3 Beach & Dune Restoration Project - Indian River County, Florida — <br /> Phase 1 Construction set-Drawin s" dated June 25 , ''- -December 23 , 2009 by <br /> Coastal Tech . exeept that Sheet 10 of 10 , assoeiated with use of the altemate <br /> Spe ^ if4� ns The Work shall be constructed in two phases ; these Specifications <br /> apply to Phase 1 of the Work,• however, the COUNTY may, at the COUNTY ' s <br /> discretion not authorize the CONTRACTOR to either construct Phase 2 or <br /> complete Phase 1 — in the event Phase 1 is not completed by the CONTRACTOR <br /> before stoppage of construction as required by the permits to protect marine <br /> turtles . The fill material shall be excavated and transported from an upland sand <br /> source located landward of the Coastal Construction Control Line (CCCL) — that <br /> is subject to the approval of the ENGINEER and COUNTY . These Technical <br /> Specifications amend or supplement the General Conditions of the Construction <br /> Contract and other provisions of the Contract Documents as indicated below . All <br /> provisions which are not so amended or supplemented remain in frill force and <br /> effect . <br /> Item 2 : Technical Specifications — Section 1 . 2 Variation in Estimated Quantity — Sand Fill <br /> Section 1 .2 is amended as follows : <br /> 1 .2 Variation in Estimated Quantity - Sand Fill . The sand fill quantity may be <br /> adjusted by the COUNTY without re -negotiations of unit price and/or terms for <br /> up to a 3340% increase or reduction of the bid quantity — as may be prescribed by <br /> Change Order. The COUNTY shall not consider the terms of the Contract to be <br /> satisfied unless at least ninety- five percent (95 % ) of the final design quantity is <br /> placed on the beach and is distributed so that each acceptance section contains no <br /> less than ninety- five percent (95 %) of its design quantity . Any adjustment in the <br /> actual quantity of material from that shown in the Contract Documents shall <br /> require a Change Order . <br /> Page 1 of 26 <br /> March 16 , 2010 <br />