My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-009A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-009A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 10:57:17 AM
Creation date
10/1/2015 5:56:26 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/04/2014
Control Number
2014-009A
Agenda Item Number
8.K
Entity Name
Ranger Construction Industries, Inc of Fort Pierce
Subject
Indian River Boulevard Resurfacing
Area
U S 1 to 17th Street
Project Number
1302
Bid Number
2014009
Supplemental fields
SmeadsoftID
12991
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00942 - Change Order Form <br />No. 1 <br />DATE OF ISSUANCE: EFFECTIVE DATE: <br />OWNER: Indian River County <br />CONTRACTOR Ranger Construction Industries, Inc. <br />Bid No. 2014009 <br />Project Indian River Boulevard Resurfacing (US 1 to 17th Street) <br />OWNER's Project No. 1302 <br />Engineer: Indian River County <br />You are directed to make the following changes in the Contract Documents: <br />Description: <br />Eliminate Bid Items 660-4-11 (Vehicle Detector Assembly (Cabinet Equipment)) and 660-4- <br />12 (Vehicle Detector Assembly (Above Ground 4 -Camera System) (Econolite)) <br />Reason for Change Order: <br />These items have been previously installed by others <br />Attachments: (List documents supporting change) <br />Descnption of Itemized Changes <br />CHANGE <br />I CHANGE IN CONTRACT PRICE: <br />IN CONTRACT TIMES <br />Description <br />Amount <br />Original Contract Price <br />$716,499.50 <br />Original Contract Time: <br />Substantial Completion: <br />Final Completion: <br />Net decrease of this Change Order: <br />$30,425.00 <br />75 <br />Contract Price with all approved <br />Change Orders: <br />$686.074.50 <br />(days or dates) <br />0 <br />0 <br />Contract Time with all approved <br />Change Orders: <br />Substantial Completion: <br />Final Completion: <br />(days <br />60 <br />CHANGE <br />IN CONTRACT TIMES <br />Descnption <br />Time <br />Original Contract Time: <br />Substantial Completion: <br />Final Completion: <br />(days) <br />60 <br />75 <br />Net increase (decrease) this <br />Change Order: <br />Substantial Completion: <br />Final Completion: <br />(days or dates) <br />0 <br />0 <br />Contract Time with all approved <br />Change Orders: <br />Substantial Completion: <br />Final Completion: <br />(days <br />60 <br />or dates) <br />75 <br />RECOMMENDED* <br />By: <br />ENGINEER (Signature) <br />Date: <br />APPROVED: <br />By: <br />OWNER (Signature) <br />Date: <br />00942 - Change Order No. 1 <br />00942 - 1 <br />F:\PuSic Works\ENGINEERING DIVISION PROJECTS11302-IR Blvd Resurfadng (SCOP) US1 to 17th SI\AdnurnkChange Orders100942 - Change Order No. 1.doc Rev 05101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.