My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-009A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-009A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 10:57:17 AM
Creation date
10/1/2015 5:56:26 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/04/2014
Control Number
2014-009A
Agenda Item Number
8.K
Entity Name
Ranger Construction Industries, Inc of Fort Pierce
Subject
Indian River Boulevard Resurfacing
Area
U S 1 to 17th Street
Project Number
1302
Bid Number
2014009
Supplemental fields
SmeadsoftID
12991
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />D ate of Issuance: , 20 <br />OWNER: Indian River County <br />CONTRACTOR: <br />P roject No.:1302 <br />P roject: Indian River Boulevard Resurfacing (US 1 to 17th Street) <br />OWNER's Bid No. 2014009 <br />(Insert Name of Contract as it appears in the Bid Documents) <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />To• <br />OWNER <br />And Tom <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER CONTRACTOR and ENGINEER, and that Work is hereby declared to be <br />substantially complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Documents. The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within days <br />of the above date of Substantial Completion. <br />00630 - Certificate of Substantial Completion REV 04-07.doc <br />00630 - 1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS11302-IR Blvd Resurfacing (SCOP) US1 to 17th StlAdmim\bid documents\00630 - Certificate of Substantial Completion <br />REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.