My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-009A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-009A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 10:57:17 AM
Creation date
10/1/2015 5:56:26 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/04/2014
Control Number
2014-009A
Agenda Item Number
8.K
Entity Name
Ranger Construction Industries, Inc of Fort Pierce
Subject
Indian River Boulevard Resurfacing
Area
U S 1 to 17th Street
Project Number
1302
Bid Number
2014009
Supplemental fields
SmeadsoftID
12991
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12.01 Change of Contract Price 34 <br />12.02 Change of Contract Times 35 <br />12.03 Delays Beyond CONTRACTOR's Control 35 <br />12.04 Delays Within CONTRACTOR's Control 35 <br />12.06 Delay Damages 35 <br />ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF <br />DEFECTIVE WORK 35 <br />13.01 Notice of Defects 35 <br />13.02 Access to Work 35 <br />13.03 Tests and Inspections 35 <br />13.04 Uncovering Work 36 <br />13.05 OWNER May Stop the Work 36 <br />13.06 Correction or Removal of Defective Work 37 <br />13.07 Correction Period 37 <br />13.08 Acceptance of Defective Work 37 <br />13.09 OWNER May Correct Defective Work 37 <br />ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION 38 <br />14.01 Schedule of Values • 38 <br />14.02 Progress Payments 38 <br />14.03 CONTRACTOR's Warranty of Title 40 <br />14.04 Substantial Completion 40 <br />14.05 Partial Utilization 40 <br />14.06 Final Inspection 41 <br />14.07 Final Payment 41 <br />14.08 Final Completion Delayed .41 <br />14.09 Waiver of Claims 42 <br />ARTICLE 15 - SUSPENSION OF WORK AND TERMINATION 42 <br />15.01 OWNER May Suspend Work 42 <br />15.02 OWNER May Terminate for Cause 42 <br />15.03 OWNER May Terminate For Convenience 43 <br />15.04 CONTRACTOR May Stop Work or Terminate 43 <br />ARTICLE 16 - DISPUTE RESOLUTION 43 <br />16.01 Methods and Procedures 43 <br />ARTICLE 17 - MISCELLANEOUS 44 <br />17.01 Giving Notice 44 <br />17.02 Computation of Times 44 <br />17.03 Cumulative Remedies 44 <br />17.04 Survival of Obligations 44 <br />17.05 Controlling Law 44 <br />00700 - General Conditions REV 5-10-13.doc <br />00700 - 4 <br />F:\Public \Vorks\ENGINEERING DIVISION PROJECTS \I302 -IR Blvd Resurfacing (SCOP) USI to 17th St\Admim\bid documents\00700 - General Conditions REV 5-t0-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.