My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-009A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-009A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 10:57:17 AM
Creation date
10/1/2015 5:56:26 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/04/2014
Control Number
2014-009A
Agenda Item Number
8.K
Entity Name
Ranger Construction Industries, Inc of Fort Pierce
Subject
Indian River Boulevard Resurfacing
Area
U S 1 to 17th Street
Project Number
1302
Bid Number
2014009
Supplemental fields
SmeadsoftID
12991
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Substitute Items <br />a. If in ENGINEER's sole discretion an <br />item of material or equipment proposed by <br />CONTRACTOR does not qualify as an <br />"or -equal" item under paragraph 6.05.A.1, it <br />will be considered a proposed substitute <br />item. <br />b CONTRACTOR shall submit suffi- <br />cient information as provided below to allow <br />ENGINEER to determine that the item of <br />material or equipment proposed is <br />essentially equivalent to that named and an <br />acceptable substitute therefor. Requests for <br />review of proposed substitute items of <br />material or equipment will not be accepted <br />by ENGINEER from anyone other than <br />CONTRACTOR. <br />c. The procedure for review by ENGI- <br />NEER will be as set forth in paragraph <br />6 05.A.2.d as supplemented in the General <br />Requirements and as ENGINEER may <br />decide is appropriate under the <br />circumstances. <br />d. CONTRACTOR shall first make <br />written application to ENGINEER for review <br />of a proposed substitute item of material or <br />equipment that CONTRACTOR seeks to <br />furnish or use. The application shall certify <br />that the proposed substitute item will <br />perform adequately the functions and <br />achieve the results called for by, the general <br />design, be similar in substance to that <br />specified and be suited to the same use as <br />that specified The application will state the <br />extent, if any to which the use of the pro- <br />posed substitute item will prejudice <br />CONTRACTOR's achievement of Substan- <br />tial Completion on time, whether or not use <br />of the proposed substitute item in the Work <br />will require a change in any of the Contract <br />Documents (or in the provisions of any other <br />direct contract with OWNER for work on the <br />Project) to adapt the design to the proposed <br />substitute item and whether or not <br />incorporation or use of the proposed substi- <br />tute item in connection with the Work is sub- <br />ject to payment of any license fee or royalty. <br />All variations of the proposed substitute <br />item from that specified will be identified in <br />the application, and available engineering, <br />sales, maintenance, repair, and <br />replacement services will be indicated. The <br />application will also contain an itemized esti- <br />mate of all costs or credits that will result <br />directly or indirectly from use of such <br />substitute item, including costs of redesign <br />and claims of other contractors affected by <br />any resulting change all of which will be <br />considered by ENGINEER in evaluating the <br />proposed substitute item ENGINEER may <br />require CONTRACTOR to furnish additional <br />data about the proposed substitute item. <br />B . Substitute Construction Methods or Proce- <br />dures: If a specific means, method, technique, se- <br />quence, or procedure of construction is shown or <br />indicated in and expressly required by the Contract <br />Documents, CONTRACTOR may furnish or utilize a <br />substitute means method, technique, sequence or <br />procedure of construction approved by ENGINEER <br />CONTRACTOR shall submit sufficient information to <br />allow ENGINEER, in ENGINEER's sole discretion, to <br />determine that the substitute proposed is equivalent to <br />that expressly called for by the Contract Documents. <br />The procedure for review by ENGINEER will be similar <br />to that provided in subparagraph 6 05 A.2. <br />C. Engineer's Evaluation: ENGINEER will be <br />allowed a reasonable time within which to evaluate <br />each proposal or submittal made pursuant to para- <br />graphs 6 05.A and 6.05 B. ENGINEER will be the <br />sole judge of acceptability. No ' or -equal' or substitute <br />will be ordered installed or utilized until ENGINEER's <br />review is complete, which will be evidenced by either a <br />Change Order for a substitute or an approved Shop <br />Drawing for an "or equal ENGINEER will advise <br />CONTRACTOR in writing of any negative <br />determination. <br />D . Special Guarantee: OWNER may require <br />CONTRACTOR to furnish at CONTRACTOR's ex- <br />pense a special performance guarantee or other <br />surety with respect to any substitute. <br />E ENGINEER's Cost Reimbursement: <br />ENGINEER will record time required by ENGINEER <br />and ENGINEER's Consultants in evaluating substitute <br />proposed or submitted by CONTRACTOR pursuant to <br />paragraphs 6.05.A.2 and 6 05.B and in making <br />changes in the Contract Documents (or in the <br />provisions of any other direct contract with OWNER <br />for work on the Project) occasioned thereby. Whether <br />or not ENGINEER approves a substitute item so pro- <br />posed or submitted by CONTRACTOR, CON- <br />TRACTOR shall reimburse OWNER for the charges <br />of ENGINEER and ENGINEER s Consultants for <br />evaluating each such proposed substitute. <br />F. CONTRACTORs Expense: CONTRACTOR <br />shall provide all data in support of any proposed <br />substitute or "or -equal" at CONTRACTOR's expense. <br />00700 - General Conditions REV 5-10-13.doc <br />00700 - 20 <br />F_1Public Works\ENGINEERING DIVISION PROJECTS\1302-IR Blvd Resurfacing (SCOP) US1 to 17th SMdmim\bid documents\00700 - General Conditions REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.