My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-009A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-009A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 10:57:17 AM
Creation date
10/1/2015 5:56:26 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/04/2014
Control Number
2014-009A
Agenda Item Number
8.K
Entity Name
Ranger Construction Industries, Inc of Fort Pierce
Subject
Indian River Boulevard Resurfacing
Area
U S 1 to 17th Street
Project Number
1302
Bid Number
2014009
Supplemental fields
SmeadsoftID
12991
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 17 - MISCELLANEOUS <br />17.01 Giving Notice <br />A. Whenever any provision of the Contract <br />Documents requires the giving of written notice, it will <br />be deemed to have been validly given if delivered in <br />person to the individual or to a member of the firm or <br />to an officer of the corporation for whom it is intended, <br />or if delivered at or sent by registered or certified mail, <br />postage prepaid, to the last business address known <br />to the giver of the notice. <br />17.02 Computation of Times <br />A. When any period of time is referred to in the <br />Contract Documents by days it will be computed to <br />exclude the first and include the last day of such <br />period. If the last day of any such period falls on a <br />Saturday or Sunday or on a day made a legal holiday <br />by the law of the applicable jurisdiction, such day will <br />be omitted from the computation. <br />17.03 Cumulative Remedies <br />A. The duties and obligations imposed by these <br />General Conditions and the rights and remedies avail- <br />able hereunder to the parties hereto are in addition to, <br />and are not to be construed in any way as a limitation <br />of, any rights and remedies available to any or all of <br />them which are otherwise imposed or available by <br />Laws or . Regulations, by special warranty or <br />guarantee, or by other provisions of the Contract <br />Documents, and the provisions of this paragraph will <br />be as effective as if repeated specifically in the <br />Contract Documents in connection with each <br />particular duty, obligation, right, and remedy to which <br />they apply. <br />17.04 Survival of Obligations <br />A. All representations, indemnifications, warran- <br />ties, and guarantees made in, required by, or given in <br />accordance with the Contract Documents, as well as <br />all continuing obligations indicated in the Contract <br />Documents, will survive final payment, completion <br />and acceptance of the Work or termination or comple- <br />tion of the Agreement. <br />17.05 Controlling Law <br />A. This Contract is to be governed by the law of the <br />state in which the Project is located. <br />• <br />00700 General Conditions REV 5-10-13 doc <br />00700 - 44 <br />FtPublic Works\ENGINEERING DIVISION PROJECTS\1302-IR Blvd Resurfacing (SCOP) US 1 to 17th St\Admim\bid documents\ 00700 - General Conditions REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.