My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-009A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-009A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 10:57:17 AM
Creation date
10/1/2015 5:56:26 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/04/2014
Control Number
2014-009A
Agenda Item Number
8.K
Entity Name
Ranger Construction Industries, Inc of Fort Pierce
Subject
Indian River Boulevard Resurfacing
Area
U S 1 to 17th Street
Project Number
1302
Bid Number
2014009
Supplemental fields
SmeadsoftID
12991
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />No. <br />DATE OF ISSUANCE* EFFECTIVE DATE <br />OWNER: Indian River County <br />CONTRACTOR: <br />P roject: Indian River Boulevard Resurfacing (US 1 to 17th Street) <br />P roject No.: 1302 <br />B id No.: 2014009 <br />Engineer: Indian River County <br />You are directed to proceed promptly with the following changes: <br />D escription: <br />Purpose of Work Change Directive: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in Method of determining change in <br />Contract Prices Contract Times <br />II Unit Prices <br />❑ Lump Sum <br />❑ Other: <br />O By Change Order: <br />❑ Contractor's Records <br />O Engineer's Records <br />n Other: <br />o By Change Order: <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated If the change involves an increase the estimated <br />amount is not to be exceeded without further time is not to be exceeded without further <br />authorization. authorization <br />ACCEPTED: <br />B y: <br />CONTRACTOR (Signature) <br />D ate: <br />RECOMMENDED: <br />By: <br />ENGINEER (Signature) <br />Date: <br />* END OF SECTION * * <br />APPROVED* <br />By: <br />OWNER (Signature) <br />Date: <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1302-IR Blvd Resurfacing (SCOP) US1 to 17th St\Admim\bid <br />documents\00948 - Work Change Directive Rev 06-2013.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.