Laserfiche WebLink
SECTION 01220 <br />PROGRESS MEETINGS <br />1.1 SCOPE <br />A. Date and Time. <br />1. Regular. Meetings: As mutually agreed upon by ENGINEER and <br />CONTRACTOR <br />2. Other Meetings: On call. <br />B. Place: CONTRACTOR'S office at Project site or other mutually agreed upon <br />location. <br />C. ENGINEER shall prepare agenda, preside at meetings, and prepare and <br />distribute a transcript of proceedings to all parties. <br />D . CONTRACTOR shall provide data required and be prepared to discuss all items <br />on agenda. <br />1.2 MINIMUM ATTENDANCE <br />A. CONTRACTOR <br />B. SUBCONTRACTOR: <br />When needed for the discussion of a particular agenda item, CONTRACTOR <br />shall require representatives of Subcontractors or suppliers to attend a meeting. <br />C. CONSTRUCTION COORDINATION MANAGER <br />D . OWNER'S representative, if required. <br />E Utility Representatives <br />F. Others as appropriate. <br />G . Representatives present for each party shall be authorized to act on their behalf. <br />1.3 AGENDA <br />Agenda will include, but will not necessarily be limited to, the following: <br />1. Transcript of previous meeting. <br />2. Progress since last meeting. <br />3. Planned progress for next period. <br />4. Problems, conflicts and observations. <br />5. Change Orders. <br />6. Status of Shop Drawings. <br />7. Quality standards and control. <br />8. Schedules, including off-site fabrication and delivery schedules. Corrective <br />measures, if required <br />9 Coordination between parties. <br />10 Safety concerns. <br />11 Other business. <br />+ + END OF SECTION + + <br />01220-1 01220 Progress Meetings <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1302-IR Blvd Resurfacng (SCOP) US1 to 17th SMdmim\bid documents\01220 - Progress <br />Meetings.doc <br />