My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-009A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-009A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 10:57:17 AM
Creation date
10/1/2015 5:56:26 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/04/2014
Control Number
2014-009A
Agenda Item Number
8.K
Entity Name
Ranger Construction Industries, Inc of Fort Pierce
Subject
Indian River Boulevard Resurfacing
Area
U S 1 to 17th Street
Project Number
1302
Bid Number
2014009
Supplemental fields
SmeadsoftID
12991
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01340 - Submittal of Shop Drawings <br />M. Upon return of a submittal marked "Revise and Resubmit", make the <br />corrections indicated and repeat the initial approval procedure. The "Not <br />Approved" notation is used to indicate material or equipment that is not <br />acceptable. Upon return of a submittal so marked, repeat the initial <br />approval procedure utilizing acceptable material or equipment. <br />N. Any related Work performed or equipment installed without an "Approved" <br />o r "Approved as Corrected" Shop Drawing will be at the sole responsibility <br />of the CONTRACTOR. <br />O. Submit Shop Drawings well in advance of the need for the material or <br />e quipment for construction and with ample allowance for the time required <br />to make delivery of material or equipment after data covering such is <br />approved. CONTRACTOR shall assume the risk for all materials or <br />e quipment which is fabricated or delivered prior to the approval of Shop <br />Drawings. Materials or equipment will not be included in periodic progress <br />payments until approval thereof has been obtained in the specified <br />manner. <br />P ENGINEER will review and process all submittals promptly, but a <br />reasonable time should be allowed for this, for the Shop Drawings being <br />revised and resubmitted, and for time required to return the approved <br />S hop Drawings to CONTRACTOR. <br />Q. Furnish required submittals with complete information and accuracy in <br />o rder to achieve required approval of an item within three submittals. All <br />costs to ENGINEER involved with subsequent submittals of Shop <br />D rawings, Samples or other items requiring approval, will be.back-charged <br />to CONTRACTOR in accordance with the General Condition's and the <br />S upplementary Conditions. If the CONTRACTOR requests a substitution <br />for a previously approved item, all of ENGINEER'S costs in the reviewing <br />and approval of the substitution will be back -charged to CONTRACTOR <br />u nless the need for such substitution is beyond the control of <br />CONTRACTOR. <br />+ + END OF SECTION + + <br />01340 Submittal of Shop Drawings.doc <br />01340-6 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1302-IR Blvd Resurfacing (SCOP) US1 to 17th StWdmim\bid documents\01340 - Submittal of <br />Shop Drawings.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.