My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-009A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-009A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 10:57:17 AM
Creation date
10/1/2015 5:56:26 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/04/2014
Control Number
2014-009A
Agenda Item Number
8.K
Entity Name
Ranger Construction Industries, Inc of Fort Pierce
Subject
Indian River Boulevard Resurfacing
Area
U S 1 to 17th Street
Project Number
1302
Bid Number
2014009
Supplemental fields
SmeadsoftID
12991
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. For construction methods (if specified): <br />a. Detailed description of proposed method. <br />b. Drawings illustrating method. <br />3. Such other data as the ENGINEER may require to establish that the <br />proposed substitution is equal to the product, manufacturer or method <br />specified. <br />C. In making Request for Substitution, CONTRACTOR represents that <br />1. CONTRACTOR has investigated proposed substitution, and deter- <br />mined that it is equal to or superior in all respects to the product, <br />manufacturer or method specified. <br />2. CONTRACTOR will provide the same or better guarantees or <br />warranties for proposed substitution as for product, manufacturer, or <br />method specified. <br />3. CONTRACTOR waives all claims for additional costs or extension of <br />time related to a proposed substitution that subsequently may become <br />apparent. <br />D. A proposed substitution will not be accepted if: <br />1. Acceptance will require changes in the design concept or a substantial <br />revision of the Contract Documents. <br />2. It will delay completion of the Work, or the work of other contractors. <br />3. It is indicated or implied on a Shop Drawing and is not accompanied by <br />a formal Request for Substitution from CONTRACTOR. <br />E If the ENGINEER determines that a proposed substitute is not equal to that <br />specified, furnish the product, manufacturer, or method specified at no additional <br />cost to OWNER <br />F. Approval of a substitution will not relieve CONTRACTOR from the requirement <br />for submission of Shop Drawings as set forth in the Contract Documents. <br />G The procedure for review by Engineer will include the following: <br />1. Requests for review of substitute items of material and equipment will <br />not be accepted by Engineer from anyone other than CONTRACTOR <br />2. Upon receipt of an application for review of a substitution Engineer will <br />determine whether the review will be more extensive than anormal shop <br />drawing review for the specified item. <br />3. If the substitution will not require a more extensive review, Engineer will <br />proceed with the review without additional cost to CONTRACTOR. <br />4. If the substitution requires a more extensive review, Engineer will <br />proceed with the review only after CONTRACTOR has agreed to <br />reimburse Owner for the review cost. <br />5 Engineer may require CONTRACTOR to furnish at CONTRACTOR's <br />expense additional data about the proposed substitute. <br />H. Any redesign of structural members shall be performed by, and the plans signed <br />and sealed by, a Professional Engineer registered in the State of Florida. The <br />01630-2 01630 Substitutions <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1302 -IR Blvd Resurfacing (SCOP) US1 to 17th St\Admim\bid documents\01630 - <br />Substitutions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.