Laserfiche WebLink
SECTION — 327 - MILLING OF EXISTING ASPHALTIC PAVEMENT <br />The work specified in this item shall conform to Section 327 of the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction (2010). <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 327-70 1 — Milling Existing Asphalt Pavement (1" Avg.)— Per SquareYard <br />SECTION — 334 - SUPERPAVE ASPHALTIC PAVEMENT <br />The work specified in this item shall conform to Section 337 of the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction (2010). <br />S ub article 334-8.1 through 334-8.3 — Basis of Payment shall be deleted in its <br />entirety. <br />S ub article 334-8.4 — Payment shall be amended as follows: <br />Bid Item No. 334-1-13 — Superpave Asphaltic Concrete — 1 %" SP 9.5 — Per Square <br />Yard. <br />SECTION - 570 — PERFORMANCE TURF <br />The work specified in this item shall conform to Section 570 of the Honda Department of <br />Transportation Standard Specifications for Road and Bridge Construction (2010). <br />A. Description: Sod for the project shall be of the variety that is common to the area <br />and of a variety approved by the Engineer. This work shall also include mowing in <br />accordance with Section 104-7.2, to be mowed at 6" height with a mulching mower. <br />B. Work Included: Scope of Work: The work specified in this section consists of the <br />e stablishing of a stand of grass within the project, right-of-way, easements, and other <br />areas indicated on the Drawings by furnishing and placing grass sod. Also included <br />are fertilizing, watering and maintenance as required to assure a healthy stand of <br />grass.Two applications of fertilizer will be required with the initial application being <br />fertilizer and the second application being "weed and feed". <br />C. Guarantee: All sodded areas shall be guaranteed for three months after date of final <br />acceptance. <br />Replacement of Defective Sod: Any dead sod or sod showing (less than 95% of a <br />square) indication of probable non survival or lack of health and vigor, or which do not <br />exhibit the characteristics to meet specifications, shall be replaced within two weeks of <br />n otice from Owner or Engineer. All replacement sod shall be furnished/installed at no <br />additional cost to the Owner and shall be guaranteed for three months. All replacement <br />shall meet original specifications. <br />The Contractor shall notify the Owner and Engineer ten days prior to the end of the <br />guarantee period and such guarantee shall be extended until notification is received. <br />At the end of the guarantee period, all sod that is dead or in unsatisfactory growth shall <br />be replaced within two weeks. <br />01025-14 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1302-IR Blvd Resurfacing (SCOP) US1 to 17th St\Admim\bid • <br />documents\Technical Specifications.doc <br />