My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-009A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-009A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 10:57:17 AM
Creation date
10/1/2015 5:56:26 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/04/2014
Control Number
2014-009A
Agenda Item Number
8.K
Entity Name
Ranger Construction Industries, Inc of Fort Pierce
Subject
Indian River Boulevard Resurfacing
Area
U S 1 to 17th Street
Project Number
1302
Bid Number
2014009
Supplemental fields
SmeadsoftID
12991
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01820 <br />Post Final Inspection <br />1.1 GENERAL <br />A. Approximately one year after Final Completion, the OWNER will make <br />arrangements with the Construction Coordination Manager and the <br />CONTRACTOR for a post final inspection and will send a written notice to said <br />parties to inform them of the date and time of the inspection. <br />B Corrections of defective work noted by OWNER and Construction Coordination <br />Manager shall comply with the applicable sections of Article 13, General <br />Conditions. <br />C. After the inspection the OWNER will inform the CONTRACTOR of any <br />corrections required to release the performance and payment bonds. <br />001820 - Post Final Inspection rev 05-13.doc <br />001820 - 1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1302-IR Blvd Resurfacing (SCOP) US1 to 17th ShAdmim\bid documents\001820 - Post Final Inspection rev 05-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.