Laserfiche WebLink
S odding shall. not be performed when weather and soil conditions are, in the <br />Engineer's opinion, unsuitable for proper results. <br />S od shall be placed around all structures, equipment pads, etc. <br />Watering: The areas on which the sod is to be placed shall contain sufficient moisture, <br />as determined by the Engineer, for optimum results. After being placed, the sod shall <br />be kept in a moist condition to the full depth of the rooting zone for at least 2 weeks. <br />Thereafter, the Contractor shall apply water as needed until the sod roots and starts to <br />grow for a minimum of 60 days (or until final acceptance, whichever is latest). <br />J. Maintenance: The Contractor shall, at his expense, maintain the sodded areas in a <br />satisfactory condition until final acceptance of the project. Such maintenance shall <br />include repairing of any damaged areas and replacing areas in which the establishment <br />of the grass stand does not appear to be developing satisfactorily. <br />Replaat+ng or- rvparr-nscessa-ry-duo-to-the-Contractor s-negligenGel-care le-s-snes-s or <br />failure to provide routine maintenance shall be at the Contractor's expense. <br />The Contractor shall maintain the sodded area up to the final acceptance date as <br />directed by the Engineer. Grass height shall not exceed 6" without mowing. Clippings <br />shall be removed from sidewalk. <br />K. Article 570-9. The first two paragraphs under this Article are deleted and the <br />following substituted: <br />The contract unit price for sodding shall include the costs of sod, fertilizer (2 <br />applications), sidewalk sweeping after mowing, mowing, pegging disposal of clippings, <br />water, tools, equipment, labor and all other incidentals necessary. <br />Item of Payment <br />P ayment shall be made under: <br />Bid Item No. 570-1-2A - Performance Turf (Sod) (Bahia) _ Per Square Yard <br />Bid Item No. 570-1-2B - Performance Turf (Sod) (St. Augustine) - Per Square Yard <br />SECTION - 700 - SIGNING AND PAVEMENT MARKINGS <br />A. Signing and pavement marking for traffic control shall conform to the <br />requirements of the Standard Specifications (2010), Manual on Uniform Traffic Control <br />D evices, Supplemental Specifications, Roadway and Traffic Design Standards, <br />manufacturer's specifications. <br />B. Traffic Signs All existing signs which are the property of the Owner shall be <br />transported to the Indian River County Road and Bridge Maintenance Yard by the <br />Contractor during construction if they are within the construction limits. Care shall be <br />exercised by the Contractor during removal, storage and relocation so as notto <br />damage the signs. If any damage occurs, as determined by the Owner's Engineer or <br />Resident Construction Inspector, the sign shall be replaced by the Contractor with no <br />compensation. <br />C. All reflective pavement markers shall be 4" x 4". <br />01025-16 Technical Specifications - Addendum 1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1302-IR Blvd Resurfacing (SCOP) US1 to 17th St\Admim\bid <br />documents\Addendum #1\Technical Specifications Add 1.doc <br />