Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) 1 \ <br />and �c-kmaleR .oNS vICTot� t Au.S\ANeS AJC• <br />(hereinafter defied CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents The Work is generally described as follows: <br />The proposed improvements to Indian River Boulevard consist of milling and <br />resurfacing of both northbound and southbound lanes from US 1 to 17th Street <br />(approximately 1 % miles in length). Also included with the project is signing and <br />marking of the proposed resurfaced lanes. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name. Indian River Boulevard Resurfacing (US 1 to 17th Street) <br />County Project Number: 1302 <br />Bid Number: 2014009 <br />Project Address: Indian River Boulevard, Indian River County, Florida. <br />ARTICLE 3 — ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 60th day after the date when the <br />Contract Times commence to run as provided in paragraph 2.03 of the General <br />Conditions, and completed and ready for final payment in accordance with paragraph <br />14 07 of the General Conditions on or before the 75 day after the date when the Contract <br />Times commence to run. <br />00520 - Agreement (Public Works) REV 04-07 <br />00520 - 2 <br />C:\Users\rgwgslb\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\GUFB029Z\00520 - Agreement (Public Works) REV 04-07.doc <br />