Laserfiche WebLink
gcol <br /> 0Lo 1 a • C) 3 <br /> INDIAN RIVER COUNTY (County) <br /> Change Order No. 6 <br /> PROJECT ; SECTOR 3 BEACH AND DUNE RESTORATION <br /> CONTRACTOR: RANGER CONSTRUCTION INDUSTRIES, INC. (Ranger) <br /> 101 SANSBURY 'S WAY <br /> WEST PALM BEACH, RL 33411 <br /> The purpose of Change Order No . 6 is to modify the Contract quantity of Sand Fill to be <br /> provided, placed, and graded by Ranger. Change Order No . 6 reduces the total contacted sand <br /> fill quantity by 25 ,818 cubic yards . <br /> Ranger' s mine sub-contractor was unable to provide the entire Contract quantity of Sand Fill. To <br /> resolve completion of the Construction Contract, Ranger placed the remaining compliant sand <br /> from the mine to construct the berm only section of the Sector 3 design template, affecting a <br /> small section of the dune design template between Treasure Shores Beach Park and a point 1 , 500 <br /> feet south. <br /> As a result of the above, the Contract quantity of Sand Fill is reduced from 586,410 cubic yards <br /> to 560, 592 cubic yards. Additionally, the total fuel cost adjustment re aining on the co 4s, <br /> $36,555 . 57) �� l� ;Cl1 iS pctntcit' c( pol� 4 -\�Q C'e ► � rcrC — /` � / - L . <br /> CURRENT CONTRACT PRICE $ 10,582,921 . 67 <br /> NET CHANGE IN CONTRACT PRICE <br /> DUE TO THIS CHANGE ORDER <br /> 25 ) 818 cy at $ 15 . 66/cy + ($440,865 .45) <br /> Remaining fuel cost adjustment of $36, 555 . 57 = <br /> $440,865 . 45 = ($404, 309 . 88 + $36, 555 . 57 = $440 ,865 . 45) <br /> CONTRACT COMPLETION DATE 5/ 1 / 12 <br /> MAXIMUM CONTRACT PRICE INCLUDING <br /> THIS CHANGE ORDER $1011421056.22 <br />