My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-018A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-018A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2015 12:31:45 PM
Creation date
10/1/2015 3:57:53 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
02/07/2012
Control Number
2012-018A
Agenda Item Number
12.J.3
Entity Name
Republic Services of Florida
Subject
Solid Waste Operations & Maintenance First Amendment to Contract Agree.
Class 1 landfill
Area
1325 74th Ave.
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
10865
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and specifications dated October 2011 . The Contractor is authorized to use the services of <br /> Golder Associates , Inc . as a subcontractor on the project . <br /> General Site Preparation <br /> • Mobilization / Demobilization <br /> • Surveying <br /> • Site Preparation for Relocation <br /> Gas Flare Relocation <br /> • Demolition/ Removal <br /> • Flare Skid Relocation <br /> Gas Collection System Relocation and Expansion <br /> • HDPE Piping <br /> • HDPE Valves and Fittings <br /> • Liquid Collection <br /> • Earthwork <br /> • Miscellaneous Items <br /> 2 . The existing Article 2 — TERM OF CONTRACT is modified to include the following : <br /> iii ) The Contractor shall be substantially completed with the Gas Flare Station <br /> Relocation at the Landfill within the following time frame : <br /> a . Within 30 calendar days from effective date of Notice to Proceed , the <br /> Contractor shall complete the following tasks, in each case assuming the <br /> cooperation of the District : <br /> 1 . Obtain all necessary permits . <br /> 2 . Receive approved shop drawings for all materials and equipment to be <br /> utilized in the job . <br /> 3 . Perform all photographic recording and documentation of conditions prior <br /> to construction . <br /> 4 . Locate all existing utilities in the area of work . <br /> 5 . Submit and secure approval of shop drawings . <br /> 6 . Mobilize all labor, equipment, and materials . <br /> 7 . Deliver and store all equipment and materials to the job site . <br /> 8 . Notify all utilities and other affected parties prior to initiating construction . <br /> b . From 30 calendar days to 60 calendar days from the effective date of Notice to <br /> Proceed , the Contractor shall complete the following tasks : <br /> 1 . Construction of concrete pad and relocation of the gas flare station ; <br /> 2 . Complete all components of the flare relocation including installation of the <br /> gas header, condensate sump , header access riser, underground valves and <br /> appurtenant structures . <br />
The URL can be used to link to this page
Your browser does not support the video tag.