My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-094
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 12:07:14 PM
Creation date
10/1/2015 6:11:02 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/08/2014
Control Number
2014-094
Agenda Item Number
15.B.3
Entity Name
Republic Services of Florida, Limited Partnership
Subject
Fourth Amendment to Contract MRF Improvement Project
Solid Waste Operations and Maintenance
Supplemental fields
SmeadsoftID
13429
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOW, THEREFORE, in consideration of these premises, and other good and valuable <br />consideration, the receipt and sufficiency of which are hereby acknowledged, the parties <br />hereto, intending to be legally bound, covenant and agree to amend the Contract as follows: <br />1. The existing Article 1 — SCOPE OF WORK of the Contract is modified to include the <br />following: <br />MATERIAL RECOVERY FACILITY (MRF) IMPROVEMENTS. The Contractor shall <br />undertake and complete improvements to the landfill MRF building as detailed below: <br />1) SWDD will direct purchase Ninety -Eight (98) Full Enviro-Block Unit and Four (4) <br />Half Enviro-Block Unit from inter -Block Retaining System, Inc. for delivery to the <br />landfill MRF, specifically the paper building. <br />2) Contractor will provide Labor which includes: unloading freight and stacking <br />blocks. <br />3) Contractor will provide for the construction and installation of the push wall into <br />the paper building. Installation of 6' x 6" x 1/2" metal angle, anchored with 1/2" <br />x 7.5" concrete anchor s to concrete floor of metal building to prevent the blocks <br />from sliding on the floor surface. This work includes providing any miscellaneous <br />equipment, supplies and parts. <br />4) Contractor, through its subcontractor, will repair the entry way into the paper <br />recycling building by furnishing all labor and material in constructing a 16' x 20' x <br />7" concrete apron with a minimum of 5,000 psi concrete and #5 Rebar 12" on <br />center each way with saw cut control joints. <br />5) SWDD shall be responsible for applying for and obtaining all necessary permits <br />and approvals, if any, in connection with the MRF improvements listed above. <br />2. The existing Article 2 — TERM OF CONTRACT is modified to include the following: <br />v) The Contractor shall use commercially reasonable efforts to complete the MRF <br />Improvement Project at the landfill within 30 calendar days from the delivery of <br />all the blocks to the IRC Landfill and no later than 90 calendar days from the <br />Notice to Proceed. Any change in contract time shall be based on authorized and <br />approved basis. <br />3. The existing Article 3 — COMPENSATION of the Contract is modified to include the <br />following: <br />xv) Payment for the MRF Improvement Project at the landfill shall not exceed <br />$18,207.10 as provided in the proposal by Contractor in Exhibit #1. <br />4. The background recitals are true and correct and form a material part of the <br />Amendment. <br />5. All terms and provisions of the Contract not amended by this Amendment shall be and <br />remain in full force and effect. <br />
The URL can be used to link to this page
Your browser does not support the video tag.