My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-094
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 12:07:14 PM
Creation date
10/1/2015 6:11:02 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/08/2014
Control Number
2014-094
Agenda Item Number
15.B.3
Entity Name
Republic Services of Florida, Limited Partnership
Subject
Fourth Amendment to Contract MRF Improvement Project
Solid Waste Operations and Maintenance
Supplemental fields
SmeadsoftID
13429
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/13/2014 10:50 7727782142 <br />• <br />RF CONCRETE CONST PAGE 01/01 <br />• <br />• <br />PROPOSAL <br />RF CONCRETE CONSTRUCTION, INC. <br />P. 0. Bat 650789, Vero Beach, Florida 32965 <br />664 Old Dixie Highway, Vero Beach, Florida 32962 <br />Phone: 772-567-33581 Fax: 772-567-3263 <br />Proposal Submitted To Phone Date <br />Republic Services 772 494-8168 June 13, 2014 <br />Street Job Name <br />1327 74" Avenue Indian River Co Landfill <br />City, State and Zip Job Location Proposal 01 <br />Vero Beach, FI 32968 <br />ATTN: Fax: <br />-Eddie-Wilson _ 772 563-0899 <br />We hereby submit an estimate for labor and material to complete the following; <br />Repair apron in front of recycling building - 16 x 20 section <br />Remove existing asphalt and fill <br />Grade, form, frame and pour 7" thick 5000 psi concrete with 115 Rebar 12" o/c each way <br />Sawaut Control Joints <br />Remove all debris - dump on site <br />Total Cost $5000.00 <br />PAYMENT SCHEDULE: Invokes due 10 days after date of invoice. AH past due amounts are subject to 2% <br />per month late charge. <br />All agreements are contingent upon strikes, accidents or delays beyond our control. All work is to be <br />completed in a workmanlike manner. Any alteration or deviation from above specifications involving extra <br />costs will be executed only upon written orders, and will become an extra charge over and above the estimate. <br />This proposal Is subject to acceptance within 30 days and is void thereafter at the option of the undersigned. <br />RF CONCRETE CONSTRUCTION, INC, <br />Authorized Signature: <br />ACCEPTANCE OF PROPOSAL: The above prices, specifications and conditions are hereby accepted. You <br />are authorized to do the work as specified. <br />DATE OF ACCEPTANCE: SIGNATURE: <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.