My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-151
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2016 11:59:09 AM
Creation date
10/1/2015 4:37:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/21/2012
Control Number
2012-151
Agenda Item Number
15.B.4
Entity Name
Resource Recovery Systems
SWDD
Subject
Recycling Services Agreement
Recyclables Transfer
Project Number
2012023
Alternate Name
ReCommunity
Supplemental fields
SmeadsoftID
11382
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( c ) Recyclable Fibers and Recyclable Containers shall be maintained <br /> separately and loaded as such in separate vehicles . Recyclable OCC shall <br /> be maintained and loaded separately unless Processor chooses to <br /> manage Recyclable OCC in another way at the County MRF . <br /> ( d ) The District shall provide Processor with monthly reports with respect to <br /> Recyclables loaded on Processor' s trucks the previous month that show <br /> scale ticket number; truck number; date ; and gross, net and tare weights <br /> ( in Tons ) . Such reports shall be delivered no later than the fifth ( 5th ) <br /> business day of each month with respect to the previous month . <br /> ( e ) Processor shall have the right to have Recyclable Materials from third <br /> parties delivered to the County MRF and loaded by the MRF Operator on <br /> Processor' s trucks . Processor shall pay SWDD $ 10 . 00 per Ton of <br /> Recyclable Materials so loaded . <br /> ARTICLE IV, PROCESSOR RESPONSIBILITIES <br /> Section 4 . 1 . Processor May Monitor Activities <br /> ( a ) Processor shall have the right, at its expense and without interfering with <br /> SWDD and operations at the County MRF, to have personnel at the <br /> County MRF to monitor activities relating to the services included in this <br /> Agreement . <br /> ( b ) Processor shall work with the MRF Operator in a collaborative manner <br /> related to the Processor' s delivery of vehicles , preference for loading of <br /> vehicles, and identification and removal of rejects . Processor shall <br /> communicate any issues in writing directly to the SWDD Director . <br /> ( c ) Further, upon approval by SWDD through an amendment or an MOU , the <br /> Processor may install such equipment as Processor deems necessary or <br /> advisable to process Recyclables at the County MRF in whatever manner <br /> Processor determines, so long as it is done at Processor' s expense, does <br /> not interfere with other operations, and does not create additional safety <br /> concerns at the County MRF . Processor shall remove such equipment <br /> within thirty ( 30) days after the end of the Term and shall leave the <br /> County MRF in substantially the same condition as before such <br /> installations . <br /> Section 4 . 2 . Material Rejection <br /> ( a ) Processor shall have the right to inspect Recyclables before loading at the <br /> County MRF . Processor shall have the right to reject Recyclables that <br /> contain more than twenty percent ( 20 % ) Rejects by volume, or which <br /> contain any amount of Hazardous Waste . Processor shall immediately <br /> notify the SWDD Director if any materials are rejected . <br /> . 7 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.