Laserfiche WebLink
SITE CLEANUP & RESTORATION <br /> 1 ) SCOPE <br /> A) The Contractor shall furnish all plant , labor, equipment , appliances and materials required or <br /> necessary to clean up the site after the construction is completed and to restore items disturbed <br /> or damaged due to his construction operation . <br /> 2 ) GENERAL <br /> A) During the progress of the project , the work and the adjacent areas affected thereby shall be kept <br /> in a neat and orderly condition . All rubbish , surplus materials , and unused construction <br /> equipment shall be removed . All damage shall be repaired so that the public and private property <br /> owners will be inconvenienced as little as possible . <br /> B ) Where material or debris has been deposited in watercourses , ditches , gutters , drains , or <br /> catch - basins as a result of the Contractor' s operations , such material or debris shall be entirely <br /> removed and satisfactorily disposed of during the progress of the work , and the ditches , <br /> channels , drains , etc . , shall be kept clean . <br /> C ) Before the completion of the project , the Contractor shall , unless otherwise especially directed or <br /> permitted in writing , tear down and remove all temporary buildings and structures which he builds ; <br /> remove all temporary Works , tools , and machinery or other construction equipment furnished by <br /> him ; remove , acceptably disinfect , and cover all organic matter and material containing organic <br /> matter in , under , and around privies , houses , and other buildings used by him , remove all rubbish <br /> from any grounds which he has occupied ; and leave the roads , all parts of the premises and <br /> adjacent property affected by his operations , in a neat and satisfactory condition . <br /> D ) It shall be the responsibility of the Contractor to repair , rebuild , or restore to its former conditions , <br /> any and all portions of existing utilities , structures , equipment , appurtenances , trees and shrubs , <br /> or facilities , other than those to be paid for under the specifications , which may be disturbed or <br /> damaged due to his construction operations . <br /> E ) l he Contractor shall thoroughly clean all materials and equipment installed by him and his <br /> subcontractors and on completion of the work shall deliver the facilities undamaged and in fresh <br /> and new-appearing condition . <br />