Laserfiche WebLink
INSTALLATION OF STRUCTURES <br /> 1 ) AS -BUILT DRAWINGS <br /> A) During the installation of the elevated walkways the Contractor shall keep accurate records of the <br /> As - Built construction showing the location of all changes in alignment , and similar data . Items <br /> shall be located from permanent objects such as centerline of street , property corner or identified <br /> point of property line , etc . Upon completion of the project the Contractor shall deliver to the <br /> Engineer an As- Built Drawing showing the above information . <br />