Laserfiche WebLink
Article 41 , LANDS FOR WORK <br /> The Owner will provide the lands upon which the work under this contract is to be done , except <br /> that the Contractor shall provide land required for the erection of temporary construction facilities <br /> and storage of his material , together with right of access to same . <br /> Article 42 , CLEANING UP <br /> The Contractor shall keep the premises free from accumulations of waste materials , rubbish and <br /> other debris resulting from his operations , remove from the Owner's property and from all public <br /> and private property at his own expense , all temporary structures , rubbish and waste materials <br /> resulting from his operation , and shall leave the site clean and ready for use by the Owner. <br /> GC- 13 <br />