7 . PARTIAL PAYMENTS - partial payments calculated from quantities of work performed will <br /> be made on or about the 10th of each month on pay estimates based on the previous <br /> month ' s progress . The Contractor shall , prior to the 25th of the preceding month , submit <br /> invoices for work performed for the previous month . The Engineer will certify all invoices <br /> before presenting them to the Owner for payment . The Engineer' s form of pay estimate <br /> stating that the bill is fair and equitable and in exact accord with the contract prices will be <br /> utilized for pay purposes . Ten percent ( 10 % ) of the amount due and payable to the <br /> Contractor will be retained from each partial payment . Final payment will be accomplished <br /> as prescribed in the Form of Agreement . <br /> 8 . RESTORATION OF DAMAGED PARTS OF THE WORK - It shall be the responsibility of <br /> the Contractor to repair , rebuild or restore to its former condition , any and all portions of <br /> existing utilities , structures , equipment , appurtenances or facilities other than those to be <br /> paid for under the specifications , which may be disturbed or damaged due to his <br /> construction operations . <br /> 9 . STANDARDS FOR QUALITY AND WORKMANSHIP - All work shall be first class and the <br /> finished product equal to the best- accepted standards of the trade and the category of <br /> work performed . <br /> 10 . TESTS - The Engineer shall have the right to require all materials to be submitted to test <br /> prior to incorporation in the work . In some instances , it may be expedient to make these <br /> tests at the source of supply and for this reason , it is required that the Contractor furnish <br /> the Engineer with information concerning the location of his source before incorporating <br /> material in the work . This does not in any way obligate the Engineer to perform tests for <br /> acceptance of material and does not relieve the Contractor of his responsibility to furnish <br /> satisfactory material . The Contractor shall furnish manufacturer' s certificates of compliance <br /> with these specifications , covering manufactured items incorporated in the work . <br /> 11 . GUARANTY - All materials and the installation thereof which are furnished and installed by <br /> the Contractor under the terms of the contract , shall be guaranteed by the Contractor <br /> against faulty workmanship , mechanical and physical defects , leakage , breakage and other <br /> damages and failure , under normal operation , for a period of one ( 1 ) year from the date of <br /> final payment , said date to constitute the commencement of the one ( 1 ) year warranty <br /> period . All materials and installations proving to be defective within the specified period of <br /> the guaranty shall be replaced , without cost to the Owner, by the manufacturer, the <br /> Contractor or by the surety . The period of guarantee of each such replacement shall be <br /> one ( 1 ) year from and after date of installation thereof . <br /> 12 . POWER AND WATER - All arrangements and costs for temporary power and water during <br /> construction , shall be the responsibility of the Contractor . If the Contractor requires water <br /> for his operations , he shall make application for service in compliance with current <br /> regulations and pay all costs in connection therewith . Unless otherwise set forth in the <br /> Schedule of Bid Items , the cost of power and water shall be included in the contract price . <br /> 13 . SALVAGED MATERIAL - All pipe , valves and fittings that are salvaged during this <br /> construction shall become the property of the Owner and shall be delivered to the Owner' s <br /> designated site of storage , and receipts therefore delivered to the Engineer within 48 hours <br /> of removal from service . <br /> SP -2 <br />