My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-051C
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-051C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2015 1:27:08 PM
Creation date
10/1/2015 4:15:57 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/20/2012
Control Number
2012-051C
Agenda Item Number
8.G.
Entity Name
Safety and Environmental Systems Inc.
Subject
Lagoon Greenway Phase II A Construction Agreement
Boardwalks and trail segments
Area
Flinn Tract
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
11050
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22 . BACKFILLING WELL POINT- HOLES — N/A <br /> 23 , OTHER CONTRACTORS - Where the work of other trades is simultaneously pursued with <br /> this contract , the procedure of the work shall be cooperative so as to permit continuous <br /> operation by each Contractor to his fullest capacity . <br /> 24 . PROJECT COORDINATION : Testing / Inspections/Completion Reports -The Contractor shall be <br /> responsible for the construction progress , including the coordination and scheduling of all <br /> required tests and inspections ( as specified in the plans , contract documents and permit <br /> conditions ) . The appropriate inspectors from the various regulatory agencies , and <br /> the engineer, shall be notified at least 24 hours prior to any required testing and <br /> inspections . <br /> 25 . Survey : <br /> A . Construction Stake - out by Contractor : The Contractor shall layout and survey the proposed <br /> construction lines and set grade stakes as required . Survey control points shall be set and/or <br /> referenced from a sketch of the boundary survey of the project site provided by the owner . <br /> Where any questions as to location , alignment or grade of the proposed construction , the <br /> Contractor shall report his findings to the Engineer for any decisions that must be made with <br /> regards to location or grade . <br /> The Contractor shall make all necessary computations to establish the exact position of all the <br /> work from the control point ( s ) which are shown on the plans or the sketch of the survey <br /> provided by the owner . All work shall be referenced to base lines which the Contractor shall <br /> establish from the control points , re -establish when necessary and maintain throughout the life <br /> of the Contract so as to permit the Engineer to make necessary preliminary , interim , and final <br /> measurements and to check the Contractor' s layout if he so desires . <br /> The Contractor shall provide and maintain offset stakes outside the limits of grading and <br /> construction . Each stake shall be identified and marked to show the offset distance from the <br /> Base Line and the Contractor shall furnish grade sheets showing the cut or fill to the finished <br /> profile lines with reference to the offset stakes . <br /> The Contractor shall be responsible for maintaining the points he has established . Any error or <br /> apparent discrepancies found in the Plans or Specifications shall be called to the Engineer' s <br /> attention for interpretation prior to proceeding with the work . <br /> The cost to the Contract of the laying out the work from lines and grades furnished in the plans <br /> by the Engineer and the cost of stakes set by the Contractor, shall be included in the price bid <br /> for the various items scheduled in the Proposal , unless a separate pay item has been included <br /> by the Engineer . <br /> B . AS - BUILT DRAWINGS - Subsequent to the completion of the contract work , but prior to <br /> submission of the request for final payment , the Contractor will prepare in duplicate "As <br /> Built" drawings of the contract work showing the final location by centerline stationing and <br /> state plan coordinates all pavement drainage and utility construction , depict any changes in <br /> the contract plans including horizontal location and vertical elevation of all elevated walkways . <br /> SP-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.