My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-165
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2015 10:59:58 AM
Creation date
10/1/2015 5:32:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/20/2013
Control Number
2013-165
Agenda Item Number
12.J.3
Entity Name
Schulke Bittle & Stoddard LLC
Subject
Summerplace Area Sewer Feasibility Study
Work Order No. 4
Supplemental fields
SmeadsoftID
12167
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 . Prepare preliminary opinion of the operational and maintenance cost of the <br /> system . <br /> 10 . Prepare a summary of the advantages and disadvantages of the three <br /> alternative systems for this particular service area . <br /> 11 . Prepare a draft report or technical memorandum of the findings of this <br /> investigation ; submit to IRCDUS staff for review. Meet with IRCDUS staff to <br /> review and discuss staff comments or concerns . <br /> 12 . Prepare and submit the final report of the findings of this investigation to the <br /> County. Final report will include recommendation for implementation of one of <br /> the three alternative sewer collection systems , and an outline of the process <br /> to implement the recommended construction of the system . <br /> 13 . Assist IRCDUS staff with presentation at up to two (2) public meetings . <br /> III . Assumptions <br /> 1 . All meetings will be held in Indian River County , <br /> 2 . Project schedule is based on a two (2) week review of the draft submittal , by <br /> the County. <br /> 3 . All costs will be based on 2013 dollars . <br /> Iv. Deliveries <br /> Schulke , Bittle & Stoddard , LLC (SBS) will submit five (5) copies of the draft <br /> report for review by the County . Twelve ( 12) copies of the final report and all <br /> applicable computer/electronic files will be submitted to the County . <br /> v. Services to be Provided by the County <br /> To support SBS 's efforts in this project, the County agrees to provide the <br /> following services : <br /> • Furnish files , drawings , previous reports , records of construction , <br /> underground utility locations , operation and maintenance data , topographic <br /> information , permits , pertinent correspondence , and any other information <br /> necessary to prosecute the work described herein . <br /> • Provide timely advice and guidance regarding County policies and technical <br /> preferences . Provide timely comments and review of information provided . <br /> The County Agrees to assist in completing this project in accordance with the <br /> proposed schedule . <br /> • Provide suitable digital files of available site plans , topography, and record <br /> drawings for the Summerplace service area and immediate adjacent <br /> properties . <br /> • Resolve all internal variance in opinion regarding technical preferences or <br /> guidance prior to directing SBS . <br /> • Provide all labor, equipment, materials , etc, needed to complete the items to <br /> be self-performed by IRC staff. <br /> Exhibit 1 <br /> Work Order No. 4 - Schulke, Bittle & Stoddard, L.L .C . <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.