My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-255
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 2:29:15 PM
Creation date
10/1/2015 3:07:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/13/2011
Control Number
2011-255
Agenda Item Number
12.J.1
Entity Name
Schulke Bittle Stoddard
Subject
Work Order No.1
North Barrier Island reclaimed water Distribution System
Area
South of SR 510
Supplemental fields
SmeadsoftID
10410
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 43 ' <br /> TIME SCHEDULE <br /> WORK ORDER NO. 1 <br /> Time of Performance <br /> The estimated time frame for completion ofservices from the approval val of this Work <br /> Order is as follows : <br /> Phase 1 — Preliminar En ineerin <br /> Route Survey, Engineering Evaluation & <br /> Hydraulic Analysis , preliminary plans, cost estimate 2 Months <br /> Phase 2 — Final design and Permitting : <br /> - Survey of WWTp , Geotechnical data, Engineering 3 <br /> Design &, preparation of Construction Plans, Months <br /> Specifications and Bid Documents <br /> Submittal of Permit Applications and Receipt of permits 2 Months <br /> Phase 3 — Procurement and Construction : <br /> Bidding, Contract Award <br /> 2 Months <br /> Construction administration and periodic <br /> construction field inspections 6 Months <br /> Remainder of Page Intentionally Left Blank <br /> P . 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.