My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-009
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 10:36:05 AM
Creation date
10/1/2015 5:54:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
01/21/2014
Control Number
2014-009
Agenda Item Number
12.J.1.
Entity Name
Schulke, Bittle & Stoddard LLC
FDOT
Subject
Amendment No.1 to Work Order No. 2
US 1 Improvement from Oslo Road to County Line
Area
US 1 & Oslo to County Line
Supplemental fields
SmeadsoftID
12807
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT `2 ' <br /> FEE SCHEDULE <br /> WORK ORDER NO. 2 <br /> AMENDMENT <br /> Method and Amount of Compensation <br /> Schulke, Bittle & Stoddard, L.L.C., proposes to provide the above Scope of Services based on the following lump sum fees: <br /> Original Change New <br /> Contract Order Contract <br /> Amount Amount <br /> 1 . Preliminary plan review and evaluation : $4500 .00 $0.00 $4,500.00 <br /> SBS will review the FDOT consultant' s preliminary <br /> plans, identify utility conflicts, and prepare typewritten <br /> request to the FDOT consultant(s) with recommended <br /> modifications to the FDOT's road and drainage design <br /> than if implemented, may result in a net construction <br /> cost savings to Indian River County. <br /> 2 . Final Design 1 $25,000.00 $29400. 00 $275400.00 <br /> Engineering design, preparation of Construction Plans & <br /> Specifications, preparation and submittal of permit <br /> Applications. Preparation of bid documents. Assistance during <br /> Bidding, bid evaluation , contract award. <br /> 3 . Contract Administration and Construction Phase services $25,000.00 $ 169341 .88 $41 ,341 . 88 <br /> Pre-con. meetings, weekly construction meetings, shop review, <br /> review pay requests, minor plan modifications, Periodic <br /> Construction/Field Inspections, As-Built review, final documentation <br /> for close-out and final certifications. <br /> 4. Reimbursable Expenses: $5,000.00 estimate $0.00 $5.000.00 estimate <br /> Payment of direct costs, including Reproduction costs <br /> (prints and copies),application fees, mail and delivery, <br /> mileage during construction phase services. <br /> (See below for actual costs) <br /> Total : $599500.00 $ 18,741 .88 $78,241 .88 <br /> Printing and Reproduction <br /> The County shall make direct payment to our office for the cost of printing project plan sheets required for utility coordination <br /> and for copies of reports, drawings, specifications, and other pertinent items required by federal, state and local agencies from <br /> who approval of the project must be obtained material suppliers, and other interested parties, but may charge only f6r the <br /> actual cost of providing such copies based on the following tabulation : <br /> 8 1 /2" x 11 " $ 0. 12/sheet Blue Line Prints $ 0.333/SF <br /> 11 " x 17" $ 0. 50/sheet Reproducible Sepias $ 0. 75/SF <br /> 31 /2 " diskette $ 2.00/each Reproducible Mylars $ 1 . 00/SF <br /> CD $ 4.00/each <br /> Application Fees <br /> The,.county shall make direct payment to our office for the actual cost of all construction permit application fees paid to <br /> jurisdictional agencies, including but not limited to : <br /> F.D, E.P. , I. R.C. Engineering (Right-of--Way), I . R. F. W.C.D., S.J . R. W. M. D., F.D.O.T. <br />
The URL can be used to link to this page
Your browser does not support the video tag.