My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-009
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 10:36:05 AM
Creation date
10/1/2015 5:54:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
01/21/2014
Control Number
2014-009
Agenda Item Number
12.J.1.
Entity Name
Schulke, Bittle & Stoddard LLC
FDOT
Subject
Amendment No.1 to Work Order No. 2
US 1 Improvement from Oslo Road to County Line
Area
US 1 & Oslo to County Line
Supplemental fields
SmeadsoftID
12807
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXH1131T 41 ' <br /> SCONE OF WORK <br /> WORK ORDER NO. 2 <br /> I ' ect Description <br /> The proposed project will provide engineering design and permitting for the construction of necessary <br /> Utility modifications to existing water mains , sewer mains and non - potable re- use water mains lying <br /> within or adjacent to US I , south of Oslo Road to the south Indian River County line , and provide <br /> necessary water main , sewer main and non - potable re - use water main " stub-outs " to serve future <br /> IRCDUS customers . The work is being completed in conjunction with the FDO 'f' ` s proposed USI <br /> ( SRS ) improvements — which generally can be described as widening the existing four ( 4 ) lane <br /> highwav to ( 6 ) lanes . <br /> " Che modifications to existing utilities are necessary to avoid conflicts with paving and drainage <br /> improvements to USI proposed by the Florida Department of Transportation ( MOT ) . The <br /> modifications generally consist of removing and replacing portions of the utility mains with new <br /> utility mains that will be deflected below or to the side of the location of proposed drainage inlets , <br /> pipes , or other roadway infrastructure improvements . <br /> I he " stub-outs" are necessary to provide accessible locations that are extended outside of the new <br /> roadway improvements proposed oil US I , making future connections and extensions of the existing <br /> Utilities possible with -out damaging the new paved road . <br /> Scope of Services <br /> Schulke, Bittle & Stoddard , L. L. C . will provide services including engineering design , preparation <br /> of construction plans , preparation and submittal of permit applications , construction administration <br /> and periodic construction field inspection of the construction , as required for the proposed water main . <br /> sewer main , and non - potable water main utility construction and modifications lying within or <br /> adjacent to US I . ( see Attachment " A " for "Location Sketch " and Attachment " B " for a preliminary <br /> list of " Utility Conflicts and Construction Cost Estimate " ) . <br /> The estimated construction cost of this project is $ 2 , 218 . 832 . 00 . <br /> In addition to the utility design services outlined above . SBS will meet with IRCDUS and <br /> the <br /> FDOT ' s design consultants and engineers involved in the project, discuss the project goals and design <br /> assumptions and requirements for the FDOT ' s proposed US I Roadway improvements , and then <br /> provide an evaluation olIthe FDOT ' s proposed US I plans , with the following specific goals : <br /> Identify the conflicts created with the existing IRCDUS utility infrastructure by the <br /> proposed construction of the roadway and drainage improvements . <br /> Recommend modifications to the FDOJ " s road and drainage design that, if implemented , <br /> may result in a net construction cost savings for Indian River County . <br /> Reduce the number of utility conflicts from that listed in Attachment " B with a <br /> corresponding reduction in anticipated construction cost . <br /> In connection with this project , the County will provide the F, ngineer with a copy of any pertinent <br /> preliminary Data or Reports ; all available drawings in electronic AutoCADD format; all surveys , <br /> maps and other documentation in the possession of or reasonably available to the County that are <br /> pertinent to the project , including plans , reports and other documents from the FDOT and its <br /> consultants . <br /> Services not included in this scope of services are listed as follows : <br /> • Any services associated with assisting Indian River County in review and evaluation <br /> of patent related disputes , issues , or claims including.; preparing to serve or serving as <br /> a consultant or witness for Indian River County in litigation , arbitration . public or <br /> private hearings , or other legal administrative proceedings involving patent related <br /> disputes , issues or claims . <br />
The URL can be used to link to this page
Your browser does not support the video tag.