My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-214
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-214
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 11:37:57 AM
Creation date
10/1/2015 4:47:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/04/2012
Control Number
2012-214
Agenda Item Number
12.J.1
Entity Name
Schulke, Bittle and Stoddard, LLC
Subject
Work Order No.2 water and sewer mains proposed drainage
Area
US 1 South of 11th Street SW
Supplemental fields
SmeadsoftID
11608
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT B - UTILITY CONFLICTS LIST AND COST ESTIMATE <br /> UTILITY CONFLICT MATRIX <br /> MONDAY, SEPTEMBER 10, 2012 <br /> INDIAN RIVER COUNTY DEPARTMENT OF UTILITY SERVICES STATE ROAD 51U8-1) UTILITY CONFLICTS <br /> LIST IS BASED ON <br /> NO DESCRIPTION STATION RECOMMENDED ACTION ESTIMATED COST NOTES <br /> WATER MAIN 10" PVC - 5-224 18" LOCATE & POTHOLE - OFFSET W.M. UNDER PROPOSED <br /> DRAINAGE 576+80 RT DRAINAGE STRUCTURE $30;000.00 <br /> 2 WATER MAIN 10" - S-22818" DRAINAGE 579+00 RT LOCATE & POTHOLE - OFFSET W.M. UNDER PROPOSED <br /> DRAINAGE STRUCTURE $30 00000 <br /> IRCDUS TO REPLACE EXISTING JACK 8 SORE WITH A DIRECTIONAL <br /> 3A FORCE MAIN 10" TRUNKUNE DRAINAGE 581+20 BORE (HOPE) AND ABANDON EXISTING PIPE INPLACE. REQUEST <br /> GENERAL CONTRACTOR TO REMOVE ABANDONED PIPE AS NEEDED <br /> AT TIME OF CONSTRUCTION. $497500,00 <br /> 584+00,00 POTENTIAL CONFLICT WITH PROPOSED MAST ARMS. RELOCATION <br /> 36 POTENTIAL CONFLICT OF WATER OR FORCE MAIN WOULD REQUIRE A LONG, DEEP (AND <br /> 585+50.00 COSTLY) DIRECTIONAL BORE. <br /> $70,000.00 <br /> 584+00.00 POTENTIAL CONFLICT WITH PROPOSED MAST ARMS. RELOCATION <br /> 3C POTENTIAL CONFLICT OF WATER OR FORCE MAIN WOULD REQUIRE A LONG, DEEP (AND <br /> 585+50.00 COSTLY) DIRECTIONAL BORE. ' <br /> S341500,00 <br /> 3D FIRE HYDRANT ASSEMBLY 585+40 LT RELOCATE BEHIND SIDEWALK $3500,00 <br /> 4 FIRE HYDRANT ASSEMBLY 588+D5 RT RELOCATE EAST OF SIDEWALK $3,500.00 <br /> SA WATER MAIN 12" PVC - S-302 588+20 RT LOCATE & POTHOLE - OFFSET W.M. UNDER PROPOSED <br /> DRAINAGE STRUCTURE <br /> $36,500,00 <br /> 5B F.M. 10* PVC - S302 588+20 RT LOCATE & POTHOLE - OFFSET F.M. UNDER PROPOSED <br /> DRAINAGE STRUCTURE <br /> - $22,500,00 <br /> FORCE MAIN 2" PVC SERVICE LINE - LOCATE & POTHOLE-REPLACE WITH 4", WITH VALVES EACH <br /> 6 TRUNKUNE DRAINAGE S-304 589+42 SIDE OF PAVEMENT TIE4N EXISTING F.M. $12,000,00 <br /> 7A WATER MAIN 12" PVC - S-304 589+62 RT LOCATE & POTHOLE POSSIBLE CONFLICT $36,500,00 <br /> 7B F.M. 10" PVC - 5304 LOCATE & POTHOLE - OFFSET F.M. UNDER PROPOSED <br /> DRAINAGE STRUCTURE $22,500.00 <br /> 6 WATER MAIN 12" PVC " CD-02 BOX CULVERT 593+05 RT LOCATE & POTHOLE $0.00 Assume NC <br /> 9 FORCE MAIN 12" PVC - CD-02 BOX CULVERT 593+05 RT LOCATE & POTHOLE $0,001 Assume NC <br /> SUBTOTAL $35100000 <br /> 1 OF <br />
The URL can be used to link to this page
Your browser does not support the video tag.